Jump to content

Line 8 (Guangzhou Metro)

From Wikipedia, the free encyclopedia
(Redirected from Line 8, Guangzhou Metro)
Line 8
Image
Image
A train of Guangzhou Metro Line 8
Overview
Other name(s)M2e ("十" shape plan name)
M2e / M3e (5 lines plan name)
M4 / M5 (7 lines plan name)
M8 (2000 plan name)
Pazhou line
(琶洲线)
StatusOperational
OwnerCity of Guangzhou
LocaleHaizhu, Liwan and Baiyun Districts
Guangzhou, Guangdong
Termini
Stations28
Service
TypeRapid transit
SystemGuangzhou Metro Guangzhou Metro
Services1
OperatorGuangzhou Metro Corporation
Rolling stock?? CRRC Zhuzhou Locomotive Metro cars[1]
Daily ridership910,700 (2025 daily average)[2]
878,000 (2019 Peak)[3]
History
Opened25 September 2010; 16 years ago (2010-09-25)
Technical
Line length33.9 km (21.1 mi)[4][5]
Number of tracks2
CharacterUnderground
Track gauge1,435 mm (4 ft 8+1⁄2 in)
ElectrificationOverhead lines, 1,500 V DC
Operating speed80 km/h (49.7 mph)
Route map

Image
North extension
(planned)
North extension
(planned)
Image
Image
Image
Jiangfu
 24 
Image
Image
connection to Line 24
Image
Image
Image
Jiangcun
Image
Jianggao
Image
Fengxiang Lu
Image
Image
Image
Liuxi River
Image
Jiaoxin
Image
Image
Image
Image
Image
Image
Image
Baiyunhu Depot
Image
Tinggang
Image
Shijing
Image
Image
Image
Shijing River
Image
Xiaoping
Image
Image
Image
Image
Image
Image
Image
Shitan
Image
Image
Image
Image
Image
Julong
 12 
Image
Image
Shangbu
Image
Tongde
Image
Ezhangtan
Image
Image
Image
Zengbu River
Image
Image
Image
Image
Image
Xicun
 5 
Image
Image
 5 
Left arrow to Jiaokou
to Wenchong Right arrow
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
 22 
Left arrow to Panyu Square
to Airport North (Terminal 2) Right arrow
Image
Image
Image
Image
Image
Image
Image
 11  Right arrow Inner Circle
Image
Image
Image
Image
Image
Image
Image
Caihong Bridge
 11   13   22 
Image
Image
Image
 13 
Left arrow to Chaoyang
to Xinsha Right arrow
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
Chen Clan Academy
 1 
Image
Hualinsi Buddhist Temple
Image
Image
Image
Image
Image
Image
Cultural Park
 6 
Image
Image
Image
Image
Image
Image
Image
Image
Image
 28  Left arrow to Luzhou
Image
Image
Image
Image
Image
Tongfuxi
Line reservation
Image
Image
Image
Haizhu Creek
Image
Fenghuang Xincun
Image
Image
Image
Image
Image
Shayuan
Image
Image
Image
Image
Baogang Dadao
Image
Image
Image
Image
Image
Image
Image
Changgang
 2 
Image
Connection to Line 2
Image
Xiaogang
Image
Sun Yat-sen University
Image
Image
Image
Image
Image
Image
Lujiang
Image
Image
Image
Image
Image
Image
Image
Kecun
 3 
Image
Connection to Line 3
Image
Image
Image
Chigang
 12 
Image
Image
Image
Image
Image
Image
Image
Huangpu Stream
Image
Image
Image
Image
Image
Image
Image
Image
Modiesha
 18   28 
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
Connection to Line 11
Image
Image
Image
Xingangdong
Image
Image
Image
Chisha Depot (Line 11)
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
Pazhou
 11   28 
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
 11  Right arrow Outer Circle
Image
Image
Image
Image
Image
Image
Left arrow Guangfo circular IR Right arrow
Image
Image
 28  Down arrow to Songshanhu
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
Wanshengwei
 4   THZ1 
Image
Image
Image
Image
Image
Image
East extension
(planned)
Image
East extension
(planned)
Image
Huangpu Old Port
Image
Xinzhou
Image
Image
Image
Image
Image
Image
Changzhou
 7 
Image
Image
Image
Image
Image
Shating
Image
Hualong
Image
Xianling
Image
Longzelu
Image
Lianhua
Line 8
Simplified Chinese广州地铁8号线
Traditional Chinese廣州地鐵8號線
Cantonese YaleGwóngjāu Deihtit Baat Houh Sin
Transcriptions
Standard Mandarin
Hanyu PinyinGuǎngzhōu Dìtiě Bā Hào Xiàn
Yue: Cantonese
Yale RomanizationGwóngjāu Deihtit Baat Houh Sin
Jyutpinggwong2 zau1 dei6 tit3 baat3 hou6 sin3
Canton Romanizationguong2 zeo1 déi6 tid3 bad3 hou6 xin3

Line 8 of the Guangzhou Metro is a north-west L-shaped line on the system that runs from Jiaoxin to Wanshengwei, spanning a total of 33.9 km (21.06 mi)[4][5] with 28 stations. It interchanges with Line 1 at Chen Clan Academy, Line 2 at Changgang, Line 3 at Kecun, Line 4 at Wanshengwei, Line 6 at Cultural Park, Line 11 at Pazhou, Line 12 at Julong and Chigang and Line 18 at Modiesha. All stations on Line 8 are underground.[6] Line 8's color is teal.

Line 8 used to run as part of Line 2 until the extension to both lines opened for trial operation on 25 September 2010, and Changgang to Fenghuang Xincun started operation on 3 November 2010.[7][8] With the northern extension of Line 8, daily ridership is projected to immediately reach 960,000 passengers per day, growing to 1.33 million per day in the short term and topping 1.65 million per day in the long-term.[9]

History

[edit]
Image
Line 8 drawn to scale.
Image
The former alignment of Line 2 before the creation of Line 8 drawn to scale.
  • 2004 - The Line 2 and 8 realignment project; and Line 8 Cultural Park to Xiaogang extension was announced. Creating Line 8 by splitting off the southeastern portion (Xiaogang to Wanshengwei) from Line 2.
  • June 2007 - Line 2 and 8 realignment; and Line 8 phase 1 (Cultural Park to Xiaogang extension) was approved by the NDRC.
  • 1 August 2007 - Construction of Line 2 and 8 realignment project; and Line 8 phase 1 extension officially commenced.
  • 10 March 2010 - Line 8 phase 2 (northern extension) was announced by extend Line 8 from Liwan to Baiyun.
  • 21 September 2010 - Line 2's services of train bound between Sanyuanli to Wanshengwei ends.
  • 25 September 2010 - Line 2 and 8 realignment project; and Line 8 phase 1 extension first section was completed and enter operation.
  • 3 November 2010 - Line 2 and 8 realignment project; and Line 8 phase 1 extension second section enter operation.
  • 9 July 2014 - Line 8 phase 3 (further north extension) was announced by further extend Line 8 from Baiyun to Huadu.
  • 28 December 2019 - The section from Cultural Park to Fenghuang Xincun was opened.[4]
  • 26 November 2020 - The section from Cultural Park to Jiaoxin was opened, except for Xicun and Caihongqiao stations.[5]
  • 28 September 2022 - Caihongqiao station was opened.
  • 28 December 2022 - Xicun station was opened.
SegmentCommencementLengthStation(s)Name
Xiaogang — Wanshengwei 25 September 2010 10.8 km (6.71 mi) 9 Line 2 & 8 realignment project
Changgang — Xiaogang 25 September 2010 0.6 km (0.37 mi) 1
Fenghuang Xincun — Changgang 3 November 2010 4.4 km (2.73 mi) 3
Cultural Park — Fenghuang Xincun 28 December 2019[4] 1.8 km (1.12 mi)[4] 2
Jiaoxin — Cultural Park 26 November 2020 16.3 km (10.13 mi)[5] 11 Northern extension
Caihong Bridge 28 September 2022 Infill station 1
Xicun 28 December 2022 Infill station 1

Stations

[edit]
Service

routes

Station
no.
Station name Connections Future Connections Distance
km
Location
English Chinese
● 801 Jiaoxin 滘心 0.00 0.00 Baiyun
● 802 Tinggang 亭岗 1.66 1.66
● 803 Shijing 石井 1.83 3.49
● 804 Xiaoping 小坪 2.00 5.49
● 805 Shitan 石潭 Guangzhou Baiyun railway station GBA PRDIR  GQ  1.35 6.84
● ● 806 Julong 聚龙  12  1204 0.79 7.63
● ● 807 Shangbu 上步 1.14 8.77
● ● 808 Tongde 同德 0.85 9.62
● ● 809 Ezhangtan 鹅掌坦 0.83 10.45
● ● 810 Xicun 西村  5  505 1.86 12.31 Liwan
● ● 811 Caihong Bridge 彩虹桥  11  1116  13  1309  22  0.96 13.27
● ● 812 Chen Clan Academy 陈家祠  1  107 1.05 14.32
● ● 813 Hualinsi Buddhist Temple 华林寺 0.76 15.08
● ● 814 Cultural Park 文化公园  6  608 1.02 16.10
● ● 815 Tongfuxi 同福西 0.88 16.98 Haizhu
● ● 816 Fenghuang Xincun 凤凰新村 0.86 17.84
● ● 817 Shayuan 沙园  Guangfo  GF21 0.83 18.67
● ● 818 Baogang Dadao 宝岗大道 1.05 19.72
● ● 819 Changgang 昌岗  2  209 0.84 20.56
● ● 820 Xiaogang 晓港 0.67 21.23
● ● 821 Sun Yat-sen University 中大 1.19 22.42
● ● 822 Lujiang 鹭江 1.69 24.11
● ● 823 Kecun 客村  3  308 1.24 25.35
● ● 824 Chigang 赤岗  12  1219 1.48 26.83
● ● 825 Modiesha 磨碟沙  18  1807  28  0.77 27.60
● ● 826 Xingangdong 新港东 1.57 29.17
● ● 827 Pazhou 琶洲  11  1102 PRDIR  ER   PL   28  0.99 30.16
● ● 828 Wanshengwei 万胜围  4  421
Haizhu Tram  THZ1  THZ110
1.83 31.99

Further North Extension

[edit]

Part of Phase 3 adjustment plan of Guangzhou Metro, now under review by the National Development and Reform Commission as of September 2022.[10] This extension will bring Line further North beyond Jiaoxin Station.[11] The extension will have provisions to be divided into two lines at Jiangfu Station. With the northern section of Line 8 between Jiangfu Station and Guangzhou North Railway Station will be spun off to form the new Line 24.[12][13]

However, according to the latest environmental impact assessment announcement, Line 24 is used as an extension of Line 8 to announce the line design information. The part to the north of Jiangfu Station is taken as part of the further north extension of Line 8, and the part to the south of Jiangfu Station is taken as the "Subline of the North Extension of Line 8". Even so, the line specifications of these two parts are still configured according to the separate Line 24, because it avoids the need to increase the number of new service lines when it is submitted to the National Development and Reform Commission for approval.[14][15][16][17]

Station name Connections Location
English Chinese
Jiangfu 江府  24  Baiyun
Jiangcun 江村
Jianggao 江高 PRDIR  GQ 
Fengxiang Road 凤翔路

East Extension

[edit]
  • Under construction. The extension is 18 km with 7 new stations.[18]
Station name[18] Connections Location
English Chinese
Fengpu Park 凤浦公园 Haizhu
Xinzhou 新洲
Changzhou 长洲  7  711 Huangpu
Exhibition & Trade City 展贸城 Panyu
Hualong 化龙
Mengdi 蒙地
Longze Road 龙泽路
Lianhua 莲花 PRDIR GLA  GH   PL 

References

[edit]
  1. ↑ "Guangzhou Metro Line 8 Stock". 10 December 2015.
  2. ↑ "Guangzhou Metro's passenger volume increased by 4.87% year-on-year last year, with three lines experiencing double-digit growth". Guangzhou Daily New Flower City. 30 August 2026.
  3. ↑ 广州地铁刷新单日客流新高 达逾1156万人次. 人民网. 2020-01-02. Retrieved 2020-01-02.
  4. 1 2 3 4 5 "八号线凤凰新村至文化公园段明天正式运营". 2019-12-27. Archived from the original on 2019-12-27. 凤凰新村至文化公园段长1.8公里,开通后,将连通广州"河南"与沿江路,八号线增加至17.6公里
  5. 1 2 3 4 "广州地铁八号线北延段正式开通 同德围"解围"-新华网". www.gd.xinhuanet.com. Archived from the original on December 4, 2020. Retrieved 2020-11-27. 此次开通的八号线北延段全长16.3公里
  6. ↑ "Guangzhou Metro". Railway-Technology.com. Retrieved 14 March 2017.
  7. ↑ "广州在线" [Guangzhou Online]. www.canton.com.cn (in Chinese). Archived from the original on 2010-09-21.
  8. ↑ 广州地铁. Gzmtr.com. 16 September 2010. Archived from the original on 28 February 2012. Retrieved 12 July 2013.
  9. ↑ "广州力争今年建成两条地铁新线--广东频道--人民网". gd.people.com.cn. Retrieved 2019-01-23.[dead link]
  10. ↑ "广州地铁24号线、8号线北延江府段正纳入建设规划调整向国家申报". 2022-09-20.{{cite web}}: CS1 maint: deprecated archival service (link)
  11. ↑ "今明两年共7条地铁新线动工 快看看有没有经过你家!". cj.sina.com.cn. Retrieved 2018-01-27.
  12. ↑ "广州8号线北延段拟分为两条线 江府站以南为8号线_房产广州站_腾讯网". gz.house.qq.com (in Chinese (China)). Archived from the original on 2018-07-12. Retrieved 2018-01-27.
  13. ↑ "详细页". www.gzggzy.cn. Archived from the original on 2018-10-15. Retrieved 2020-08-22.
  14. ↑ "广州市城市轨道交通8号线北延段工程(滘心~广州北站)社会稳定风险分析公众意见征询公示". 广州地铁集团有限公司. 2022-12-11. Archived from the original on 2022-12-11.
  15. ↑ "广州市城市轨道交通8号线北延段支线工程(江府~纪念堂)社会稳定风险分析公众意见征询公示". 广州地铁集团有限公司. 2022-12-11. Archived from the original on 2022-12-11.
  16. ↑ 王彤 (2019-12-10). "地铁24号线纳入三期调整 争取年内上报国家审批". 新快报. Archived from the original on 2022-12-13.
  17. ↑ 李天研 (2022-12-21). "8号线北延段速度分两档,快速列车可由广州北站直通纪念堂". 广州日报.{{cite web}}: CS1 maint: deprecated archival service (link)
  18. 1 2 "8号线东延段新版站点揭晓,拟增设龙泽路站". 2023-03-09.