Jump to content

Plochingen–Immendingen railway

From Wikipedia, the free encyclopedia
(Redirected from Neckar-Alb Railway)
Plochingen–Immendingen
Overview
Line number4600
LocaleBaden-Württemberg, Germany
Service
Route number
  • 740 (Stuttgart–Singen (Hohentwiel)/Freudenstadt)
  • 743 (Rottweil/Sigmaringen–Blumberg-Zollhaus)
  • 755 (Ulm–Donaueschingen)
  • 760 (Stuttgart–Tübingen)
  • 774 (Tübingen–Pforzheim)
  • 790.1 (Herrenberg–Kirchheim (Teck))
Technical
Line length161.5 km (100.4 mi)
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Minimum radius222 m (728 ft)
Electrification15 kV 16.7 Hz AC
Route map

km
Image
Image
0.0
Plochingen
Image
Image
Image
Image
Image
Image
Image
Wernau concrete plant siding
Image
2.6
Wernau (Neckar)
Image
Image
Image
Erwin Behr company siding
Image
Image
Otto & Söhne textile factory siding
Image
6.7
Wendlingen (Neckar)
264 m
Image
Image
Image
Image
connection to Wendlingen–Ulm HSR
Image
Image
Image
Image
Image
Image
Image
Little Wendlingen Curve (under construction)
Image
9.6
Oberboihingen
Image
12.6
Nürtingen
283 m
Image
Image
Image
17.2
Neckartailfingen
until 1976
306 m
Image
Autmut
Image
22.2
Bempflingen
342 m
Image
26.2
Metzingen (Württ)
354 m
Image
Image
Image
Image
31.5
Reutlingen-Sondelfingen
393 m
Image
33.5
Reutlingen transfer station
Image
Image
Image
Image
34.7
Reutlingen Hbf
375 m
Image
Image
Image
Image
Image
Image
Image
Image
Former Reutlingen Tramway (line 3)
Image
Image
Image
Image
Former Reutlingen Tramway (line 1)
Image
35.5
Reutlingen West
Image
Image
Reutlingen Bösmannsäcker
(planned)
Image
Image
Image
Image
37.5
Reutlingen-Betzingen
345 m
Image
40.0
Wannweil
Image
42.2
Kirchentellinsfurt
312 m
Image
45.9
Tübingen-Lustnau
Image
46.3
Tübingen freight yard
Image
Image
Tübingen Neckaraue Hp
(planned)
Image
48.8
Tübingen Hbf
322 m
Image
Image
Image
Tübingen Mühlbachäcker
(planned)
Image
Image
Image
51.6
Weilheim
Image
Kilchberg Ort
(planned)
Image
53.5
Kilchberg
(operations station)
Image
Tübingen-Bühl
(planned)
Image
56.3
Kiebingen
Image
Image
DHL siding
Image
59.4
Rottenburg am Neckar
Image
Neckar
Image
62.9
Bad Niedernau
Image
Neckar bei Bad Niedernau
Image
66.1
Bieringen (bei Horb)
Image
Sulzau
(planned)
Image
Sulzau Tunnel (493 m)
Image
Börstingen
(planned)
Image
72.4
Eyach
Image
Image
Image
Eyach
Image
77.0
Mühlen (bei Horb)
Image
Image
from Stuttgart
Image
80.3
Horb am Neckar
Image
81.6
Horb Rbf
Image
85.6
Dettingen (Horb)
Image
87.3
Neckarhausen
Image
90.3
Fischingen (Sulz am Neckar)
Image
94.4
Sulz (Neckar)
Image
94.7
Sulz tunnel (297 m)
Image
99.7
Grünholz
Image
103.4
Oberndorf-Aistaig
Image
105.5
Oberndorf (Neckar)
Image
108.9
Altoberndorf
Image
111.5
Epfendorf
Image
115.3
Talhausen-Herrenzimmern
Image
116.9
Talhausen
Image
117.3
Neckar (53 m)
Image
117.4
Hohenstein Tunnel (103 m)
Image
118.8
Neckar (57 m)
Image
120.0
Tierstein Tunnel (654 m)
Image
120.8
Neckar (48 m)
Image
120.8
Bernburg Tunnel (269 m)
Image
121.1
Neckar (41 m)
Image
Image
Rottweil gunpowder factory siding
Image
Rottweil Pulverfabrik
Image
122.3
Au Tunnel (114 m)
Image
123.4
Rottweil
Image
123.8
Neckar (53 m)
Image
Image
Image
Image
124.5
Rottweil-Göllsdorf
Image
Image
125.8
Rottweil Saline
Image
Image
Image
Image
Image
Image
129.4
Rottweil-Neufra
Image
130.2
Neufra (b Rottweil)
Image
131.8
Neuhaus
Image
134.2
Aldingen (b Spaichingen)
Image
136.4
Hofen (b Spaichingen)
Image
136.8
Spaichingen Mitte
Image
138.4
Spaichingen
670 m
Image
Image
to Reichenbach (until 1966)
Image
139.9
Balgheim
Image
143.5
Rietheim (Württemberg)
684 m
Image
145.3
Weilheim (Württemberg)
Image
Wurmlingen
Image
147.2
Wurmlingen Nord
Image
148.0
Wurmlingen Mitte
was Wurmlingen Ort
Image
150.4
Tuttlingen Schulen
Image
150.6
Danube (38 m)
Image
Image
Image
151.2
Tuttlingen
649 m
Image
Image
(since 1934)
Image
Tuttlingen Gänsäcker
Image
153.7
Danube
Image
154.3
Möhringen Bahnhof
652 m
Image
Möhringen Rathaus
Image
Immendingen Mitte
Image
Image
Image
161.0
Immendingen
658 m
Image
km
Source: German railway atlas[1]

The Plochingen–Immendingen railway is a main-line railway line in the German state of Baden-Württemberg. It runs from Plochingen via Horb am Neckar to Immendingen, following the upper reaches of the Neckar from Plochingen to Neckartailfingen and from Kirchentellinsfurt to Rottweil, and finally the Danube from Tuttlingen to the end of the line. It was therefore also historically known as the Obere Neckarbahn (Upper Neckar Railway) or the Obere Neckartalbahn (Upper Neckar Valley Railway). The Rottweil-Immendingen section used to be called the Obere Donaubahn (Upper Danube Railway) or Obere Donautalbahn (Upper Danube Valley Railway).

The Plochingen–Tübingen section is now sometimes known as the Neckar-Alb-Bahn (Neckar-Alb Railway), the Tübingen–Horb section as the Kulturbahn (Culture Railway), the Horb–Tuttlingen section as part of the Gäubahn (Gäu Railway) and the Tuttlingen–Immendingen section as the Donaubahn (Danube Railway).

History

[edit]

Plochingen was connected to the network of the Royal Württemberg State Railways (Königlich Württembergische Staats-Eisenbahnen) in 1846 with the building of the Fils Valley Railway (Filstalbahn). The Upper Neckar Railway was extended from there to the south as follows:

20 September 1859:Plochingen – ReutlingenLicensed on 6 May 1857
15 October 1861:Reutlingen – Rottenburg am NeckarLicensed on 17 November 1858
1 November 1864:Rottenburg am Neckar – Eyach
1 December 1866:Eyach – Horb
8 October 1867:Horb – Talhausen
23 July 1868:Talhausen – Rottweil
15 July 1869:Rottweil – TuttlingenLicensed on 13 August 1865
26 July 1870:Tuttlingen – Immendingen

When it was being built, the line between Tuttlingen and Möhringen an der Donau, which was initially single-track, crossed the border from Württemberg to Baden and also passed through the Province of Hohenzollern near Dettingen. Württemberg therefore concluded a treaty with Prussia on 13 March 1865 and with the Grand Duchy of Baden on 18 February 1865, but built and operated the entire length of the line itself. At the border station of Immendingen at the time, there was a connection to the Black Forest Railway that had opened two years earlier.

With the completion of the Stuttgart–Horb railway, the so-called Gäubahn, in 1879, the Plochingen–Horb section lost some of its importance because the direct connection from Stuttgart to the south ran through the Korngäu from then on. In contrast, the Horb–Immendingen section became increasingly important and, from 1900, had international express train services to Switzerland and, in later years, also to Italy.

On 28 October 1899, the second track went into operation between Plochingen and Wendlingen (Neckar). From 1900 this extended to Neckartailfingen, from 1 October 1901 to Metzingen (Württ) and from October 1902 to Reutlingen. Later it was extended to Tübingen. The Plochingen–Tübingen section was electrified by 1 October 1934 for Stuttgart suburban traffic.

On 23 and 24 October 1927, the state of Württemberg and Deutsche Reichsbahn signed a contract for the duplication of the Horb–Tuttlingen section. The state granted the national railway a loan of 35 million Reichsmarks (equivalent to €145m). Work on this began as early as 1928, but it was not until 1941 that the work was largely complete, apart from a 2.3-kilometre section between Aistaig and Oberndorf am Neckar. This last section followed in 1943.[2] A simplification of operations had been enabled by the commissioning of the Tuttlingen–Hattingen railway in 1933. It removed the need for trains to and from Singen to detour via Immendingen and reverse there. In the course of the upgrade at that time, Deutsche Reichsbahn also greatly expanded Horb and Rottweil stations and replaced Tuttlingen station with a large new building.

During the Second World War, the Mauser works in Oberndorf am Neckar, an important pillar of German arms production, was an important business on the line. During the war, the line was largely spared from major destruction until February 1945. In 1944/45, Allied aerial bombing caused serious damage to the stations in Horb, Rottweil, Spaichingen and Tuttlingen, but these did not interrupt traffic permanently. It was not until February 1945 that Allied bomber formations destroyed a bridge during an attack on Oberndorf, disrupting rail traffic.

After the war, France, unlike the United States, exercised its right to reparations on a large scale and in 1946 dismantled the second track between Horb and Tuttlingen that had been laid only a few years earlier.[3] On 25 September 1977, the Horb–Tuttlingen section was electrified. At the same time, Deutsche Bundesbahn abandoned services at numerous stations on this section in order to increase travel speeds in local traffic through so-called "express train driving". During the electrification, the iron girder bridge on the disused Balingen–Rottweil line had to be removed to make room for the catenary.[4] Also due to the restricted loading gauge, the remaining track in the five tunnels of this section has been running in the middle since then, which makes it difficult to restore double track.

The former stations at Bempflingen, Betzingen and Kirchentellinsfurt were downgraded halts in the second half of the 20th century. In addition, practically all sidings between Plochingen and Tübingen, many sidings and freight yards were abandoned and mostly separated from the main-line track during conversions.

In the course of the introduction of the Ringzug ("ring train"), which serves the route between Rottweil and Immendingen, in 2003, DB Station&Service reactivated several abandoned stations and built more new ones. From June to November 2008, the district of Rottweil examined expanding Ringzug operations to the Rottweil–Horb section. In return, however, the Regional-Express stops in Sulz am Neckar and Oberndorf am Neckar would have been eliminated. However, this model ultimately failed due to resistance from the affected towns of Oberndorf and Sulz.[5]

Oberndorf station was modernised in 2014 and 2015 at a cost of €2.9m.[6]

Between 6 June and 22 November 2016, 28 kilometres of track and 44 sets of points were renewed between Plochingen and Tübingen for €27m.[7] The section between Reutlingen and Tübingen was completely closed due to construction work between 12 November and 3 December 2021.[8]

Passenger operations

[edit]

Only the section between Horb and Tuttlingen is used by long-distance rail passenger services apart from a few IC train pairs on the Stuttgart–Tübingen section. There are hourly intercity trains on Intercity line 87, which can also be used by passengers with local rail passenger transport tickets. The following lines operate in local transport:

LineOperatorWhole routeSection on route 4600Frequency
IRE 6aSWEG Bahn Stuttgart (trains ending in Tübingen) / DB Regio Baden-Württemberg (trains running to Aulendorf)Stuttgart Hbf – Reutlingen – Tübingen – Sigmaringen – AulendorfPlochingen (non stop) – Tübingen Hbf Every two hours (between Stuttgart and Tübingen coupled with IRE 6b), supplemented by every two hours by IRE 6a Stuttgart – Reutlingen – Tübingen with more intermediate stops
IRE 6bDB Regio Baden-WürttembergStuttgart Hbf – Reutlingen – Tübingen – Rottenburg am Neckar (– Horb)Plochingen (non stop) – Rottenburg am Neckar (– Horb) Every two hours (Stuttgart and Tübingen coupled with IRE 6a)
RE 4DB RegioStuttgart Hbf – KonstanzHorb – Tuttlingen Some trains (seasonal)
MEX 12SWEG Bahn StuttgartHeilbronn Hbf – Tübingen HbfPlochingen – Tübingen Hbf Hourly
RE 14aDB Regio Baden-WürttembergStuttgart Hbf – RottweilHorb – Rottweil Every two hours
RE 55DB Regio Baden-WürttembergUlm Hbf – Villingen (Schwarzwald)Tuttlingen – Immendingen Hourly (Ulm – Donaueschingen), two hourly (continuing to Villingen)
MEX 18SWEG Bahn StuttgartOsterburken – Tübingen HbfPlochingen – Tübingen Hbf Hourly
RB 43Hohenzollerische LandesbahnRottweil – Blumberg-ZollhausRottweil – Immendingen
RB 43aHohenzollerische LandesbahnSigmaringen – ImmendingenTuttlingen – Immendingen
RB 63DB Regio Baden-WürttembergBad Urach – HerrenbergMetzingen (Württ) – Tübingen Hbf (at least) hourly
RB 74DB Regio Baden-WürttembergTübingen Hbf – Pforzheim HbfTübingen Hbf – Horb Hourly (split in Horb), two hourly (coupled Tübingen – Pforzheim)
S 1DB Regio S-Bahn StuttgartHerrenberg – Kirchheim (Teck)Plochingen – Wendlingen (Neckar) (at least) every half hour

With the timetable change in June 2020, Abellio Rail Baden-Württemberg took over the electrically-operated services between Plochingen and Tübingen. The procured electric railcars were not available at the beginning, instead rented railcars were used. Especially in the first few weeks after the start of operations, a lack of rolling stock and technical problems led to numerous train cancellations.[9]

In regional transport, between Plochingen and Bempflingen the tariff of the Verkehrs- und Tarifverbund Stuttgart (VVS), applies, from Bempflingen to Eyach that of the Verkehrsverbund Neckar-Alb-Donau (naldo), from Eyach to Horb that of the Verkehrs-Gemeinschaft Landkreis Freudenstadt (VGF), from Horb to Immendingen that of the Zweckverband Verkehrsverbund Schwarzwald-Baar-Heuberg (VVR).

Freight operations

[edit]

Starting in Plochingen, regular freight traffic now operates from and to Wendlingen am Neckar (from there on to Oberlenningen), to and from Nürtingen (from there on to Neuffen) and to and from Metzingen (from there on via the Ermstalbahn to Dettingen an der Erms).

The town of Reutlingen has secured the site of the former goods yard in order to have a site ready for the construction of a container yard in the long term. The site of the former Tübingen freight yard was largely cleared in 2015 and the tracks were removed, and the freed-up areas were subsequently developed.[10]

On one to two working days a week, the route is served in the mornings by a Hohenzollerische Landesbahn train running from the Tübingen freight yard to Eyach in order to carry scrap and timber towards Mengen.[11] In Eyach, the train changes to the Eyach–Hechingen railway. There is no regular freight traffic between Eyach and Horb. All sidings on the line have been closed and some have been built over. For example, Rottenburg goods yard disappeared years ago in favour of a new bus station.

Hohenzollerische Landesbahn also runs cement trains from Dotternhausen to Switzerland via Tuttlingen.

After the track was lowered at the Rastatt tunnel in mid-August 2017, the route was temporarily used around the clock on weekdays.[12][13] About 35 freight trains ran on the line every day.[14]

Operational issues

[edit]

Due to the topography and the lack of a second track between Horb and Tuttlingen, the trains on this section are still comparatively slow today. In addition to intercity, regional express and freight traffic, since 2003 the line has also had to accommodate Ringzug traffic between Rottweil and Immendingen, so that there are a particularly large number of train crossings. The line is also in competition with the modern Autobahn 81.

Planning

[edit]

For several years it has been planned to establish new or reactivated stations on the Tübingen–Rottenburg section, including at Buhl, Kilchberg and Weilheim. However, this would require sections of double track.[15] The electrification of the line has been discussed on several occasions as a diversion route for the Stuttgart–Horb railway.

For several years discussion have been under way on plans to integrate the line with the Neckar-Alb Railway line, together with other regional lines (Ammer Valley Railway, Erms Valley Railway, Swabian Alb Railway and the Zollernalb Railway), into the Neckar-Alb Regional Stadtbahn on the Karlsruhe model. This would require electrification of the lines. Because of the general financial situation, however, implementation is not currently in sight.

It is planned in the long run to integrate train control technology on the line, along with the Nagold Valley Railway and the Zollernalb Railway, with the regional electronic interlocking in Freudenstadt.

References

[edit]

Footnotes

[edit]
  1. ↑ Eisenbahnatlas Deutschland (German railway atlas). Schweers + Wall. 2009. ISBN 978-3-89494-139-0.
  2. ↑ Egon, Hopfenzitz (1999). Staatseisenbahn in Württemberg 1845–1994 (in German). Stuttgart: Rubrik Gäubahn.
  3. ↑ "Gäubahn-Abschnitt wird ausgebaut". Eisenbahn-Revue International (in German) (6): 323. 2019.
  4. ↑ "Schömberg–Rottweil" (in German). vergessene-bahnen.de. Retrieved 21 February 2023.
  5. ↑ "Ringzug wird nicht nach Horb rollen" (in German). Neue Rottweiler Zeitung. 3 November 2008. Archived from the original on 20 May 2009. Retrieved 22 February 2023.
  6. ↑ "2,9 Millionen Euro für Station der Gäubahn". DB Welt, Regionalteil Südwest (in German) (11): 17. 2015.
  7. ↑ "28 Kilometer neue Gleise und 44 Weichen". Nürtinger Zeitung (in German). 4 February 2016. p. 16.
  8. ↑ Klein, Patrick (2 November 2021). "Tübingen — Stuttgart" (PDF) (in German). Abellio. Retrieved 22 February 2023.
  9. ↑ "Minor question from Abg. Andreas Deuschle CDU and response from the Ministry of Transport: Current situation of the Tübingen–Stuttgart railway connection after the connection was taken over by the Abellio railway company" (PDF). Landtag Records (in German). Landtag of Baden-Württemberg: 2 f., 5. 29 July 2020. Retrieved 22 February 2023.
  10. ↑ "Alter Güterbahnhof" (in German). Retrieved 23 February 2023.
  11. ↑ "Übersichtsplan des Verkehrsgebiets der HzL in Baden-Württemberg" (PDF) (in German). Archived from the original (PDF) on 20 July 2011. Retrieved 23 February 2023.
  12. ↑ "Nächtlicher Zugverkehr auf der Neckar-Alb-Bahn (Strecke Horb–Tübingen–Reutlingen–Plochingen)" (Press release) (in German). Deutsche Bahn. 17 August 2017. Archived from the original on 16 August 2017. Retrieved 2017-08-17.
  13. ↑ "Nach Rheintal-Sperrung: Gäubahn vorzeitig für Fern- und Güterverkehr geöffnet" (Press release) (in German). Deutsche Bahn. 2017-09-04. Archived from the original on 5 September 2017. Retrieved 4 September 2017.
  14. ↑ Keck, Christine (2 September 2017). "Die Hälfte der Güterzüge rollt wieder". Stuttgarter Nachrichten (in German). Vol. 72, no. 203. pp. 6 f.
  15. ↑ Gemeinderatsvorlage 274/2004 (Tübingen)

Sources

[edit]
  • Reichhold, Dieter (2010). Obere Neckarbahn : eine Zeitreise auf der Strecke Plochingen, Wendlingen, Nürtingen, Metzingen, Reutlingen (in German) (1 ed.). Münsingen-Rietheim: Wiedemann. ISBN 978-3-941453-09-8.
[edit]