Jump to content

Western Trunk line

From Wikipedia, the free encyclopedia
(Redirected from Western Line, Taiwan)
Western Trunk line
Image
Western Trunk line in blue
Overview
Native name西部幹線
Termini
Stations134
Service
TypeConventional railway
OperatorTaiwan Railway Corporation
History
Opened10 August 1902
Technical
Line length420.8 km (261.5 mi)[a]
Number of tracks2 (predominantly)
Track gauge3 ft 6 in (1,067 mm)
Electrification25 kV/60 Hz catenary
Operating speed130 km/h (81mph)
Route map

Station
km
km
Station
Image
0.0
Keelung
Image
1.3
Sankeng
Image
Image
(Eastern Trunk line Right arrow)
Image
3.7
Badu
Image
6.0
Qidu
Image
8.7
Baifu
Image
11.7
Wudu
Image
13.1
Xizhi
Image
14.6
Xike
Image
19.1
Nangang Image
Image
21.9
Songshan Image
Image
28.3
Taipei Image Image Taiwan High Speed Rail
Image
31.1
Wanhua
Image
35.5
Banqiao Image
Image
38.0
Fuzhou
Image
40.9
Shulin
Image
42.9
South Shulin
Image
44.8
Shanjia
Image
49.2
Yingge
Image
57.4
Taoyuan
Image
63.3
Neili
Image
67.3
Zhongli
Image
73.1
Puxin
Image
77.1
Yangmei
Image
83.9
Fugang
Image
85.6
Xinfu
Image
87.1
Beihu
Image
89.6
Hukou
Image
95.8
Xinfeng
Image
100.6
Zhubei
Image
Image
(Neiwan line Right arrow)
Image
105.0
North Hsinchu
Image
106.4
Hsinchu
Image
111.2
Sanxingqiao
Image
114.4
Xiangshan
Image
120.8
Qiding
Zhunan
0.0
Image
125.4
Zhunan
Image
Tanwen
4.5
Image
Image
130.7
Zaoqiao
Dashan
11.2
Image
Image
136.6
Fengfu
Houlong
15.0
Image
Image
140.6
Miaoli
Longgang
18.6
Image
Image
147.2
Nanshi
Baishatun
26.7
Image
Image
151.4
Tongluo
Xinpu
29.8
Image
Image
158.8
Sanyi
Tongxiao
35.6
Image
Image
169.7
Tai'an
Yuanli
41.7
Image
Image
172.3
Houli
Rinan
49.4
Image
Image
179.1
Fengyuan
Dajia
54.0
Image
Image
181.6
Lilin
Taichung Port
59.3
Image
Image
184.1
Tanzi
Image
Image
186.0
Toujiacuo
Image
Image
187.7
Songzhu
Image
Image
189.2
Taiyuan
Qingshui
65.3
Image
Image
191.2
Jingwu
Shalu
68.5
Image
Image
193.3
Taichung
Image
Image
195.3
Wuquan
Longjing
73.1
Image
Image
197.5
Daqing
Image
Image
200.5
Wuri
Dadu
78.1
Image
Image
201.3
Xinwuri Taiwan High Speed Rail
Zhuifen
83.1
Image
Image
203.8
Chenggong
Image
(Left arrow Chengzhui line Right arrow)
Changhua
90.2
Image
210.9
Changhua
Image
217.5
Huatan
Image
222.1
Dacun
Image
225.6
Yuanlin
Image
229.1
Yongjing
Image
232.8
Shetou
Image
237.1
Tianzhong
Image
242.9
Ershui
Image
Image
(Jiji line Right arrow)
Image
251.0
Linnei
Image
255.8
Shiliu
Image
260.6
Douliu
Image
268.2
Dounan
Image
272.1
Shigui
Image
276.7
Dalin
Image
282.5
Minxiong
Image
289.2
Jiabei
Image
291.8
Chiayi
Image
298.4
Shuishang
Image
301.0
Nanjing
Image
307.0
Houbi
Image
314.7
Xinying
Image
318.0
Liuying
Image
321.9
Linfengying
Image
327.4
Longtian
Image
329.6
Balin
Image
334.2
Shanhua
Image
337.1
Nanke
Image
341.8
Xinshi
Image
346.8
Yongkang
Image
350.5
Daqiao
Image
353.2
Tainan
Image
360.8
Bao'an
Image
362.2
Rende
Image
364.8
Zhongzhou
Image
Image
(Shalun line Right arrow)
Image
367.7
Dahu
Image
370.6
Luzhu
Image
378.4
Gangshan Image
Image
382.0
Ciaotou Image
Image
386.2
Nanzi
Image
391.3
Xinzuoying Image Taiwan High Speed Rail
Image
393.2
Zuoying–Jiucheng
Image
394.4
Neiwei
Image
396.1
Museum of Fine Arts
Image
397.3
Gushan
Image
399.0
Sankuaicuo
Image
399.8
Kaohsiung Image
Image
401.2
Minzu
Image
402.2
Sci-tech Museum
Image
404.0
Zhengyi
Image
405.6
Fongshan
Image
409.3
Houzhuang
Image
413.6
Jiuqutang
Image
418.6
Liukuaicuo
Image
420.8
Pingtung
Image
(Down arrow South Link line)

Western Trunk line (Chinese: 縱貫線; pinyin: Zòngguàn xiàn; Pe̍h-ōe-jī: Chhiòng-koàn sòaⁿ) is a railway line of Taiwan Railway in western Taiwan.[1][2] It is by far the busiest line, having served over 171 million passengers in 2016. The total length of the line is 404.5 km (251.3 mi).

The line is an official classification of physical tracks and does not correspond to particular services. It is connected to Taichung line (mountain line; 山線) at Zhunan and Changhua. Many services turn inland to take the Taichung route, then reconnect back to the main line (West Coast line). Train schedules and departure boards mark either mountain or coastal (海線) line to indicate the route taken.

History

[edit]

The original railroad between Keelung and Twatutia was completed in 1891. The section between Twatutia and Hsinchu was finished in 1893. However, in the Japanese era, these sections were all rebuilt by the Government-General of Taiwan as part of its Taiwan Trunk Railway (縱貫鐵道, Jūkan Tetsudō) project. The Taiwan Trunk Railway was completed in 1908 with route from Kīrun (基隆, Keelung) through Taihoku (臺北, Taipei), Shinchiku (新竹, Hsinchu), Taichū (臺中, Taichung), Tainan (臺南, Tainan), to Takao (高雄, Kaohsiung).

The Taiwan Trunk Railway at that time went through all major cities in western Taiwan. However, the terrain around Taichū (Taichung) created a significant bottleneck for rail freight transport. To resolve this issue, the Government-General of Taiwan decided to build a Coastal Line (海岸線, Kaigan-sen) between Chikunan (竹南, Zhunan) and Shōka (彰化, Changhua) to relieve the congestion. The construction of the Coastal Line was started in 1919 and completed in 1922. The Coastal Line then became a part of the main West Coast Line, and the original railway through Taichū (Taichung) was named as a separate line (Taichung line).

Due to service patterns, the following lines are often collectively referred to as the Western main line (Chinese: 西部幹線; Pe̍h-ōe-jī: Se-pō͘ Kàn-sòaⁿ)

NameChineseTaiwaneseHakkaLengthTerminus
West Coast line縱貫線Chhiòng-koàn SòaⁿChiúng-kon Sien404.5 km (251.3 mi) from Keelung to Kaohsiung
Taichung line臺中線Tâi-tiong SòaⁿThòi-chûng Sien85.5 km (53.1 mi) from Zhunan to Changhua (via Taichung)
Pingtung line屏東線Pîn-tong SòaⁿPhìn-tûng Sien61.3 km (38.1 mi) from Kaohsiung to Fangliao

Stations

[edit]
NameChineseTaiwaneseHakkaTransfers and notesLocation
Keelung基隆Ke-lângKî-lùng Ren'aiKeelung
Sankeng三坑Saⁿ-kheⁿSâm-hâng
Badu八堵Peh-tó͘Pat-tú→ Taiwan Railway Yilan line Nuannuan
Qidu七堵Chhit-tó͘Chhit-tú Qidu
Baifu百福Pah-hokPak-fuk
Wudu五堵Gō͘-tó͘Ńg-tú XizhiNew Taipei
Xizhi汐止Se̍k-chíSip-chṳ́
Xike汐科Se̍k-khoSip-khô
Nangang南港Lâm-kángNàm-kóng Taiwan High Speed Rail Nangang
ImageImage Nangang
NangangTaipei
Songshan松山Siông-sanChhiùng-sân ImageImage Songshan Songshan
Taipei臺北Tâi-pakThòi-pet Taiwan High Speed Rail Taipei

ImageImageImage Taipei Main
ImageImage Beimen
ImageImage Taipei Main (200m)

Zhongzheng
Wanhua萬華Bān-hôaVan-fà ImageImage Longshan Temple Wanhua
Banqiao板橋Pang-kiôPán-khiâu Taiwan High Speed Rail Banqiao
ImageImage Banqiao

ImageImage Banqiao

BanqiaoNew Taipei
Fuzhou浮洲Phû-chiuFeù-chû
Shulin樹林Chhiū-nâSu-lìm Shulin
South Shulin南樹林Lâm-chhiū-nâNàm Su-lìm
Shanjia山佳Soaⁿ-á-khaSân-kâ
Yingge鶯歌Eng-koYîn-kô ImageImage Yingge Yingge
Taoyuan[b]桃園Thô-hn̂gThò-yèn TaoyuanTaoyuan
Neili內壢Lāi-le̍kNui-la̍k Zhongli
Zhongli中壢Tiong-le̍kChûng-la̍k Image Image Zhongli (u/c)
Puxin埔心Po͘-simPu-sîm Yangmei
Yangmei楊梅Iûⁿ-mûiYòng-mòi
Fugang富岡Hù-kongFu-kông
Xinfu新富Sin-hùSîn-fu
Beihu北湖Pak-ô͘Pet-fù HukouHsinchu
County
Hukou湖口Ô͘-kháuFù-khiéu
Xinfeng新豐Sin-hongSîn-fûng Xinfeng
Zhubei竹北Tek-pakChuk-pet Zhubei
North Hsinchu北新竹Pak Sin-tekPet Sîn-chuk→ Taiwan Railway Neiwan line EastHsinchu
Hsinchu新竹Sin-tekSîn-chuk→ Taiwan Railway Neiwan line
Sanxingqiao三姓橋Saⁿ-sèⁿ-kiôSâm-siang-khiâu Xiangshan
Xiangshan香山Hiong-sanHiông-sân
Qiding崎頂Kiā-téngKhi-táng ZhunanMiaoli
County
Zhunan竹南Tek-lâmChuk-nàm→ Taiwan Railway Taichung line
Tanwen談文Tâm-bûnThàm-vùn Zaoqiao
Dashan大山Tōa-soaⁿThai-sân Houlong
Houlong後龍Āu-lângHeu-liùng
Longgang龍港Lêng-kángLiùng-kóng
Baishatun白沙屯Pe̍h-soa-tūnPha̍k-sâ-thûn Tongxiao
Xinpu新埔Sin-po͘Sîn-phû
Tongxiao通霄Thong-siauThûng-siau
Yuanli苑裡Oán-líYén-lî Yuanli
Rinan日南Ji̍t-lâmNgit-nàm DajiaTaichung
Dajia大甲Tāi-kahThai-kap
Taichung Port臺中港Tâi-tiong-kángThòi-chûng-kóng Qingshui
Qingshui清水Chheng-chúiChhîn-súi
Shalu沙鹿Soa-lakSâ-lu̍k Shalu
Longjing龍井Liông-chéⁿLiùng-chiáng Longjing
Dadu大肚Tōa-tō͘Thai-tú Dadu
Zhuifen追分Tui-hunTûi-fûn → Taiwan Railway Chengzhui line (to Taichung line)
Changhua彰化Chiong-hoàChông-fa→ Taiwan Railway Taichung line ChanghuaChanghua
County
Huatan花壇Hoe-toâⁿFâ-thàn Huatan
Dacun大村Tāi-chhoanThai-chhûn Dacun
Yuanlin員林Oân-lîmYèn-lìm Yuanlin
Yongjing永靖Éng-chēngYún-chhìn Yongjing
Shetou社頭Siā-thâuSa-theù Shetou
Tianzhong田中Tiân-tiongThièn-chûng Tianzhong
Ershui二水Jī-chúiNgi-súi→ Taiwan Railway Jiji line Ershui
Linnei林內Nâ-lāiLìm-nui LinneiYunlin
County
Shiliu石榴Chio̍h-liûSa̍k-liû Douliu
Douliu斗六Táu-la̍kTeú-liuk
Dounan斗南Táu-lâmTeú-nàm Dounan
Shigui石龜Chio̍h-kuSa̍k-kuî
Dalin大林Tōa-nâThai-lìm DalinChiayi
County
Minxiong民雄Bîn-hiôngMìn-hiùng Minxiong
Jiabei嘉北Ka-pakKâ-pet EastChiayi
Chiayi嘉義Ka-gīKâ-ngiImage Taiwan Railway Alishan Forest Railway West
Shuishang水上Chúi-siōngSúi-sông ShuishangChiayi
County
Nanjing南靖Lâm-chēngNàm-chhìn
Houbi後壁Āu-piahHeu-piak HoubiTainan
Xinying新營Sin-iâⁿSîn-yàng Xinying
Liuying柳營Liú-iâⁿLiú-yàng Liouying
Linfengying林鳳營Lîm-hōng-iâⁿLìm-fung-yàng Lioujia
Longtian隆田Liông-tiânLùng-thièn Guantian
Balin拔林Pa̍t-á-nâPha̍t-lìm
Shanhua善化Siān-hòaSan-fa Shanhua
Nanke南科Lâm-khoNàm-khô Xinshi
Xinshi新市Sin-chhīSîn-sṳ
Yongkang永康Éng-khongYún-không Yongkang
Daqiao大橋Tōa-kiôThai-khiâu
Tainan臺南Tâi-lâmThòi-nàm East
Bao'an保安Pó-anPó-ôn Rende
Rende仁德Jîn-tekYìn-tet
Zhongzhou中洲Tiong-chiuChûng-chû→ Taiwan Railway Shalun line
Dahu大湖Tōa-ô͘Thai-fù LujhuKaohsiung
Luzhu路竹Lō͘-tekLu-chuk
Gangshan岡山Kong-sanKông-sân Image Gangshan Gangshan
Qiaotou橋頭Kiô-á-thâuKhiâu-thèu Image Image Ciaotou Ciaotou
Nanzi楠梓Lâm-á-kheⁿNâm-chṳ́ Nanzi
Xinzuoying新左營Sin-chó-iâⁿSîn-chó-yàng Image Taiwan High Speed Rail Zuoying
Image Image Zuoying/THSR
Zuoying
Zuoying–Jiucheng左營·舊城Chó-iâⁿ (Kū-siâⁿ)Chó-yàng (Khiu-sàng)
Neiwei內惟Lāi-ûiNui-vì Gushan
Museum of
Fine Arts
美術館Bí-su̍t-koánMî-su̍t-kón Image TRA Museum of Fine Arts Station
Gushan鼓山Kó͘-san Image Gushan
Sankuaicuo三塊厝Saⁿ-tè-chhùSân-khoài-chhṳ̀ Sanmin
Kaohsiung高雄Ko-hiôngKô-hiùng → Taiwan Railway Pingtung line
Image Image Kaohsiung Main

Notes

[edit]
  1. ↑ Keelung to Pingtung via Taichung
  2. ↑ Taoyuan Metro's Green Line is expected to have connection to this station once construction is complete.

References

[edit]
  1. ↑ "About TRA". Taiwan Railways Administration.MOC. December 11, 2008. Archived from the original on 4 April 2019. Retrieved 1 March 2017.
  2. ↑ "Statistics". 交通部臺灣鐵路管理局 (in Chinese). December 11, 2008. Archived from the original on 7 June 2016. Retrieved 1 March 2017.