Delancey Street over FDR DRIVE, EAST RIVER, L
Map
Coordinates:
+40.71498, -73.9762840°42'54" N, 73°58'35" W
Facts
Source: National Bridge Inventory. Information not verified; use at your own risk.
| Name: | Delancey Street over FDR DRIVE, EAST RIVER, L |
| Structure number: | 000000002240039 |
| Location: | WILLIAMSBURG BR EAST RVR |
| Purpose: | Carries highway and railroad over highway and waterway |
| Route classification: | Principal Arterial - Other Freeways or Expressways (Urban) [12] |
| Length of largest span: | 1599.8 ft. [487.6 m] |
| Total length: | 6668.3 ft. [2032.4 m] |
| Roadway width between curbs: | 76.4 ft. [23.3 m] |
| Deck width edge-to-edge: | 117.1 ft. [35.7 m] |
| Vertical clearance above deck: | 13.5 ft. [4.1 m] |
| Vertical clearance below bridge: | 134.8 ft. [41.1 m] |
| Skew angle: | 2° |
| Owner: | City or Municipal Highway Agency [04] |
| Year built: | 1903 |
| Year reconstructed: | 2002 |
| Historic significance: | Bridge is not eligible for the National Register of Historic Places [5] |
| Number of main spans: | 9 |
| Main spans material: | Steel [3] |
| Main spans design: | Suspension [13] |
| Deck type: | Closed Grating [4] |
| Wearing surface: | Integral Concrete (separate non-modified layer of concrete added to structural deck) [2] |
Latest Available Inspection: October 2016
| Good/Fair/Poor Condition: | Fair |
| Status: | Open, no restriction [A] |
| Average daily traffic: | 83,754 [as of 2011] |
| Truck traffic: | 5% of total traffic |
| Deck condition: | Good [7 out of 9] |
| Superstructure condition: | Satisfactory [6 out of 9] |
| Substructure condition: | Satisfactory [6 out of 9] |
| Structural appraisal: | Equal to present minimum criteria [6] |
| Deck geometry appraisal: | Basically intolerable requiring high priority of replacement [2] |
| Underclearances appraisal: | Basically intolerable requiring high priority of corrrective action [3] |
| Water adequacy appraisal: | Equal to present minimum criteria [6] |
| Roadway alignment appraisal: | Equal to present desirable criteria [8] |
| Channel protection: | Banks are protected or well vegetated. River control devices such as spur dikes and embankment protection are not required or are in a stable condition. [8] |
| Pier/abutment protection: | None present but re-evaluation suggested [5] |
| Scour condition: | Bridge foundations determined to be stable for assessed or calculated scour condition. [5] |
| Operating rating: | 56.8 tons [51.6 metric tons] |
| Inventory rating: | 27.0 tons [24.5 metric tons] |
| Sufficiency rating: | 47.8 |
| Recommended work: | Widening of existing bridge with deck rehabilitation or replacement. [34] |
| Estimated cost of work: | $91,768,000 |
Previous Inspections
| Date | Suff. Rating | Condition | Deck | Superstructure | Substructure | SD/FO | ADT |
|---|
| October 2016 | 47.8 | Fair | Good | Satisfactory | Satisfactory | FO | 83754 |
| October 2014 | 48.1 | Fair | Good | Satisfactory | Satisfactory | FO | 54948 |
| October 2012 | 38.1 | Fair | Good | Fair | Satisfactory | FO | 54948 |
| November 2010 | 47.1 | Fair | Good | Satisfactory | Satisfactory | - | 78223 |
| October 2008 | 47.1 | Fair | Very Good | Satisfactory | Satisfactory | - | 96576 |
| November 2006 | 47.1 | Fair | Excellent | Satisfactory | Very Good | - | 71143 |
| October 2004 | 20.6 | Fair | Excellent | Fair | Good | - | 54948 |
| August 2002 | 31.4 | Good | Excellent | Very Good | Good | - | 98746 |
| December 2000 | 0.0 | Poor | Fair | Poor | Fair | SD | 98746 |
| November 1998 | 0.0 | Poor | Poor | Serious | Fair | SD | 98746 |
| October 1996 | 0.0 | Poor | Poor | Serious | Serious | SD | 94898 |
| December 1994 | 0.0 | Poor | Serious | Serious | Serious | SD | 94898 |
| December 1992 | 0.0 | Poor | Serious | Serious | Serious | SD | 94898 |
| January 1991 | 0.0 | Poor | Serious | Serious | Serious | SD | 94898 |