Jurong Pier MRT station
Jurong Pier
JS12 CR21
裕廊渡头
ஜூரோங் பியர் Dermaga Jurong | ||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Jurong Pier MRT station site in May 2025 | ||||||||||||||||
| General information | ||||||||||||||||
| Coordinates | 01°18′47″N 103°42′37″E / 1.31306°N 103.71028°E | |||||||||||||||
| System | Future Mass Rapid Transit (MRT) station | |||||||||||||||
| Owner | Land Transport Authority | |||||||||||||||
| Operator | Singapore One Rail | |||||||||||||||
| Line | ||||||||||||||||
| Platforms | 2 (1 island platform) | |||||||||||||||
| Tracks | 2 | |||||||||||||||
| Connections | Bus, Taxi | |||||||||||||||
| Construction | ||||||||||||||||
Structure type | Elevated | |||||||||||||||
Platform levels | 1 | |||||||||||||||
| Parking | Yes | |||||||||||||||
Cycle facilities | Yes | |||||||||||||||
| Accessible | Yes | |||||||||||||||
| Other information | ||||||||||||||||
| Station code | JRP | |||||||||||||||
| History | ||||||||||||||||
| Opening | 2029 (JRL) late-2030s; 13 years' time (CRL) | |||||||||||||||
| Services | ||||||||||||||||
| ||||||||||||||||
| ||||||||||||||||
Jurong Pier MRT station is a future Mass Rapid Transit (MRT) interchange station on the Jurong Region Line (JRL) and Cross Island Line (CRL). It is located on the boundary of Boon Lay and Jurong East planning areas in Singapore. On the JRL, the station serves as the southern terminus of the mainline from Choa Chu Kang, while trains entering service at this station will head towards Peng Kang Hill via Bahar Junction.
First announced in May 2018, the station is expected to be completed in 2029 as part of JRL Stage 3. It is planned to become an interchange with the CRL in the late 2030s.
History
[edit]Jurong Region Line
[edit]On 9 May 2018, the Land Transport Authority (LTA) announced that Jurong Pier station would be part of the proposed JRL.[1] The station will be constructed as part of Phase 3, consisting of 7 stations – a 4 station extension to this station from Boon Lay and a 3 station extension to Peng Kang Hill from Tawas. It was expected to be completed in 2028.[2] However, the restrictions on construction due to the COVID-19 pandemic has led to delays, with the completion date pushed to 2029.[3]
The contract for the design and construction of the Jurong Hill and Jurong Pier stations and 1.1 km (0.68 miles) of associated viaducts – Contract J112[4] – was awarded to a joint venture between China Civil Engineering Construction Corporation (Singapore Branch) (CCECC) and SCB Building Construction Pte Ltd at S$263 million (US$192.79 million) on 6 April 2021.[5][6]
Cross Island Line
[edit]On 31 July 2026, transport minister Jeffrey Siow announced that this station will interchange with the Cross Island Line (CRL), as part of Phase 3 of the line. The CRL station is expected to be completed by the late 2030s.[7][8][9]
Station details
[edit]The station will serve the Jurong Region Line (JRL) as the southern terminus of the main route, with the preceding station being Jurong Hill. The official station code will be JS12.[10] Jurong Pier station will be situated along Jurong Pier Road, next to the Jurong Pier Circus and Jurong Pier Flyover. The station is planned to have three entrances.[11]
References
[edit]- ↑ Lim, Adrian (9 May 2018). "New Jurong Region Line to boost access for NTU students". The Straits Times. Archived from the original on 9 April 2021. Retrieved 9 April 2021.
- ↑ "News Room - News Releases - Joint News Release by the Land Transport Authority (LTA) & SLA - Jurong Region Line: Enhancing Connectivity in the West". Land Transport Authority. 9 April 2021. Archived from the original on 9 April 2021. Retrieved 9 April 2021.
- ↑ "Written Reply by Minister for Transport Ong Ye Kung to Parliamentary Question on Prioritising Early Completion of Jurong Region MRT Line". www.mot.gov.sg. 1 February 2021. Archived from the original on 9 April 2021. Retrieved 24 March 2021.
- ↑ "Contract J112" (PDF). Land Transport Authority. Archived (PDF) from the original on 8 April 2021. Retrieved 8 April 2021.
- ↑ "Two Civil Contracts to Construct Four Stations for the Jurong Region Line Awarded". Land Transport Authority. 6 April 2021. Archived from the original on 6 April 2021. Retrieved 8 April 2021.
- ↑ "Two Civil Contracts to Construct Four Stations for the Jurong Region Line Awarded". Land Transport Authority. 6 April 2021. Retrieved 2 September 2024.
- ↑ Guang-Xi, Justin Ong (31 July 2026). "Cross Island Line to get 4 new stations linking Taman Jurong and western industrial estates by late 2030s". CNA. Retrieved 31 July 2026.
- ↑ Hamzah, Aqil; Chelvan, Vanessa Paige (31 July 2026). "4 new MRT stations to be built for Cross Island Line; interchanges at Jurong Pier, Gul Circle". The Straits Times. Retrieved 31 July 2026.
- ↑ "为建跨岛线第三阶段 征用大士工业地段". 联合早报 (in Chinese). 31 July 2026. Retrieved 31 July 2026.
- ↑ "Future system map" (PDF). Land Transport Authority. Archived (PDF) from the original on 5 April 2021. Retrieved 9 April 2021.
- ↑ "JS12 Jurong Pier". Land Transport Authority. Archived from the original on 2 April 2021. Retrieved 9 April 2021.