Mission Park station

Mission Park
Image
An outbound train at Mission Park station in 2022
General information
LocationHuntington Avenue at Mission Park
Boston, Massachusetts
Coordinates42°20′00″N 71°06′34″W / 42.3332°N 71.1095°W / 42.3332; -71.1095
PlatformsNone (passengers wait on sidewalk)
Tracks2
ConnectionsImage MBTA bus: 39, 66
Construction
AccessibleNo
History
RebuiltFall 2027– Late 2029 (planned)
Passengers
2011548 daily boardings[1]
Services
Preceding station Image MBTA Following station
Riverway Green Line Fenwood Road
Location
Map

Mission Park station is a light rail stop on the Green Line E branch of the MBTA subway system, located on Huntington Avenue in the Mission Hill neighborhood of Boston, Massachusetts. The station is located on a street running segment of the E branch; trains run in mixed traffic rather than a dedicated median. The station has no platforms; riders wait on the sidewalks (shared with bus stops for the route 39 and 66 buses) and cross the street to reach trains.[2] Mission Park station is not accessible, a reconstruction for accessibility is planned between 2027 and 2029.[1]

Reconstruction

[edit]

In 2021, the MBTA indicated plans to modify the Heath Street–Brigham Circle section of the E branch with accessible platforms to replace the existing non-accessible stopping locations.[3] The new platforms are planned to be long enough to accommodate two 110-foot (34 m) Type 10 vehicles. Design work began in July 2023.[4][5] In December 2024, the MBTA indicated that platforms would be built at Riverway and Mission Park, while Fenwood Road and Back of the Hill would be closed.[6] As of December 2025, design work is expected to be completed in late 2026, with construction taking place in 2027–2029.[7]

References

[edit]
  1. 1 2 "Ridership and Service Statistics" (PDF) (14th ed.). Massachusetts Bay Transportation Authority. 2014.
  2. ↑ "Mission Park Station Neighborhood Map" (PDF). Massachusetts Bay Transportation Authority. July 2012. Archived from the original (PDF) on March 31, 2016. Retrieved December 20, 2016.
  3. ↑ Peña, Angel (June 21, 2021). "Green Line Transformation (GLT) Update" (PDF). Massachusetts Bay Transportation Authority. p. 7.
  4. ↑ "System-Wide Accessibility Initiatives—November 2023" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. November 27, 2023. p. 5.
  5. ↑ "Accessibility Initiatives—June 2024" (PDF). Massachusetts Bay Transportation Authority. June 25, 2024. p. 5.
  6. ↑ "Accessibility Initiatives—December 2024" (PDF). Massachusetts Bay Transportation Authority. December 6, 2024. p. 5.
  7. ↑ "Accessibility Initiatives—December 2025" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. December 2, 2025. p. 5.
[edit]

Wikimedia Commons logo Media related to Mission Park station at Wikimedia Commons