Jump to content

Trams in Graz

From Wikipedia, the free encyclopedia

Graz tramway network
Image
Image
Variobahn at Kaiser-Josef-Platz (2020)
Operation
LocaleGraz, Styria, Austria
StatusOperational
Lines6[1]
OwnerCity of Graz
OperatorHolding Graz (since 2007 (2007))
Infrastructure
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
17,5 m
Electrification600 V DC
DepotsRemise I (Alte Poststraße),
II and III (Steyrergasse)
Stock86[2]
Statistics
Route length70.4 km (43.7 mi)[2]
Stops95
Average speed70 km/h (43 mph) max.
201253.56 million[2]
Horse tram era: 1878–1899
OwnerGrazer Tramway
OperatorGrazer Tramway
Propulsion system
Horses
Electric tram era: 1899 (1899)–present
StatusStill running
OperatorHolding Graz (since 2007 (2007))
Track gauge1,435 mm (4 ft 8+1⁄2 in) standard gauge
Propulsion system
Electricity
Electrification600 V DC
Overview
Image
Map of the Graz tram network, 2021.
Websitehttps://www.holding-graz.at/linien.html Holding Graz Linien (in German)

The Graz tramway network is a network of tramways forming an important part of the public transport system in Graz, which is both the capital city of the federal state of Styria, Austria, and the second largest city in Austria.

In operation since 1878, the network presently has six daytime lines, and five evening and Sunday lines. As of 2012, the Graz tram network ran on an almost 60 kilometres (37 mi) of route, and served 53.56 million passengers.[2] It is operated by the Graz Linien division of Holding Graz, the city owned utility company who also operate the city's bus network and the Schlossbergbahn funicular railway. The trams form part of the Styrian integrated fare system which covers all modes of public transport in Graz and Styria.

The Tramway Museum Graz, at the terminus of line 1 in Mariatrost, holds many exhibits relating to the system.[3]

History

[edit]
Image
The first electric tram in 1899

The first trams to run in Graz were horse trams in private ownership, with service commencing in 1878. The lines were electrified from 1899. In 1939, the tram network was acquired by the city.[3]

In 1941, the narrow gauge electric railway that had linked Graz with the suburb of Mariatrost since 1898, was converted to standard gauge and became part of the tram network. The resulting long outer section of tram route 1 still retains many light railway features, with its off-street routing and long stretches of single track.[3][4]

Image
Graz trams in 1977
Image
Subsurface tramstop at Graz main railway station from 2012

The Graz tram network reached a peak in 1950. Growing car ownership, and the growth of residential areas in outer reaches of the city not served by the trams, led to a fall in tram usage and eventually, after 1950, the closure of several tram routes. The city introduced trolleybuses in 1941 to serve the outer areas of the city, but these were replaced by motor buses by 1967.[3]

In the 1990s, with the city's narrow central streets proving ill-suited to large quantities of private car traffic, the city adopted a policy of improving and expanding public transport, with modernisation and extension of the tramway. The area around Jakominiplatz was developed as the main tram and city bus interchange from 1995, whilst extensions to Puntigam, Liebenau/Murpark and St Peter followed in 2006 and 2007.[3]

In 2001, Graz was the launch customer for the Bombardier Cityrunner with 18 27 m (89 ft) long five-section trams purchased. These were the city's first low-floor trams, although the concept was introduced in 1999 by the fitting of new low-floor centre sections to 12 existing trams.[3]

In 2007, Graz ordered 45 Stadler Variobahn trams for delivery between 2009 and 2015. These vehicles proved controversial, with complaints over noise and vibration levels. Initially confined to the north–south axis lines 4 and 5, the trams started operating on the east–west axis in 2013, after modifications and imposition of a speed limit.[3][5]

In 2012, new tram tunnels were built to serve the city's main railway station (Graz Hauptbahnhof), which was previously the terminus of two tram lines and some distance from the main westbound tram route. Trams on the main line now stop in a new subsurface tram station in the station forecourt area. This allows the station to be served by four of the city's six lines.[3]

In 2016 a new extension of line 7 in order to serve the new medical campus of the University of Graz in Stiftingtalstraße was constructed and opened to the public on 11 September 2016. The line was extended by one stop from the previous terminus at St. Leonhard.[6]

On 29 November 2025, the Neutorlinie line opened between Jakominiplatz and Annenstraße via Neutorgasse to relieve congestion along Herrengasse in the city centre. Line 17 would use the Neutorlinie with line 16 taking over on evenings, weekends and holidays.[7][8]

Operation

[edit]
Historical Line 2 (Circle line)
Hauptbahnhof - Hauptbahnhof
Overview
Native nameLinie 2 (Ringlinie)
Termini
  • Hauptbahnhof
  • Hauptbahnhof (until 1962)
    Keplerbrücke (until 1963)
    Wormgasse (until 1971)
Stations17 (1899-1953)
18 (1954-62)
14 (1962-63)
12 (1963-71)
Color on mapred (until March 25, 1911 (1911-03-25))
History
OpenedAugust 21, 1888 (1888-08-21) as horse tramway
July 24, 1899 (1899-07-24) as electric tramway
ClosedDecember 31, 1953 (1953-12-31) connection Hbf
June 5, 1962 (1962-06-05) Keplerstraße
November 14, 1963 (1963-11-14) Wickenburgg.
January 17, 1971 (1971-01-17) remaining parts
Technical
Line length6.0 km (3.7 mi)
Route map

km
Tracksheme 1950
Image
Image
0,0/~6,0
Südbahnhof (Hauptbahnhof) 1
Image
Image
Image
← 5 to Eggenberg, 7 to Wetzelsdorf
Image
Image
Image
→ from 1953 on separate stops at Hbf
Image
Image
0,3
Annenstraße 1
Image
Image
5,7
Babenbergerstraße
Image
Image
0,6
Esperantoplatz 1 5 7
Image
Image
5,5
Marienplatz
Image
Image
Image
5,4
right mill canal
Image
Image
Image
Image
5,0
Lendplatz
3 to Gösting
Image
Image
Image
0,9
Roseggerhaus
1 5 7, 3 to Krenngasse
Image
Image
Image
Image
0,9
mill canal Elisabethstraße
Image
Image
1,3
Südtirolerplatz 1 5 7
Image
Image
Image
1,4/4,6
Mur
Image
Image
Image
4,5
left mill canal (until 1977)
Image
Image
terminus from 1962
Image
Image
Image
4,5
Schloßbergplatz/Keplerbrücke
4 to Andritz
Image
Image
1,7
Hauptplatz 1 4 5 7
Image
Image
4,1
Grabenstraße
Image
Image
3 to Gösting, 6 to Puntigam
Image
Image
2,2
Jakominiplatz 1 3 4 5 6 7
Image
Image
4 to Liebenau, 5 to Zentralfriedhof
Image
Image
3 to Krenngasse, 6 to St. Peter
Image
Image
terminus from 1963
Image
Image
3,9
Wormgasse
Image
Image
2,6
Kaiser-Josef-Platz 1 7
Image
Image
3,7
Geidorfplatz
Image
Image
2,8
Rechbauerstraße 1 7
Image
Image
Image
3,3
Zinzendorfgasse
until 1971
Image
1 to Mariatrost, 7 to St. Leonhard/LKH
Line 1
Eggenberg/UKH - Mariatrost
Overview
Native nameLinie 1
Termini
  • Eggenberg/UKH
  • Mariatrost
Stations32
Color on maplight blue
History
Current route sinceSeptember 10, 1990 (1990-09-10)
Technical
Line length11.2 km (7.0 mi)
Route map

km
Image
Göstinger Straße
Image
Image
Image
0,0
Eggenberg/UKH
(emergency hospital)
380
Image
Image
Image
0,4
Alt-Eggenberg
376
Image
Image
Image
Image
0,5
Baiernstraße
Image
Image
Image
0,8
Schloss Eggenberg
369
Image
Image
Image
Image
0,8
Schloßstraße
Image
Image
1,2
Auster Sport- und Wellnessbad
(public pool "Oyster")
366
Image
Image
1,5
Vinzenzgasse
365
Image
Image
1,7
Georgigasse
365
Image
Image
Image
Image
Image
Image
1,7
Alte Poststraße
Image
Image
1,7
Georgigasse
365
Image
Image
Image
Image
Image
2,0
turnaround Laudongasse
Image
Image
Image
Image
Image
(Laudongasse)
365
Image
Image
Image
Image
Image
Image
2,2
Asperngasse
(Access to Hbf Image S 1-S 7)
365
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
2,2
6 to Smart City
364
Image
Image
Image
Image
Image
Image
Image
2,4
4 to Reininghaus, 7 to Wetzelsdorf
Image
Image
Image
2,5
Köflacher Gasse/PVA Park and Ride 4 6 7
(Image S 61 S 7)
362
Image
Image
Image
Image
Image
Image
Image
Image
2,5
← Köflacher Gasse/→ Waagner-Biro-Straße
Image
Image
Image
Image
2,7
Sublevel section local transport hub Hauptbahnhof
Image
Image
Image
Image
Image
2,7
364
Image
Image
Image
Image
2,9
Hauptbahnhof 4 6 7 Image S 1-S 7
357
Image
Image
Image
Image
Image
Image
3,0
← Eggenberger Gürtel/→ Bahnhofgürtel
Image
Image
Image
Image
Image
3,1
sublevel section ramp
Image
Image
Image
Image
Image
3,1
Annenstraße
Image
Image
Image
3,3
Esperantoplatz/Arbeiterkammer 4 6 7
355
Image
Image
Image
Image
Image
Image
Image
3,3
← Idlhofgasse/→ Hans-Ressel-Gasse
Image
Image
3,6
Roseggerhaus 4 6 7
351
Image
Image
Image
Image
Image
Image
Image
Image
Image
3,6
← Elisabethinergasse/→ Volksgartenstraße (line planned)
Image
Image
Image
Image
Image
3,6
right to river Mur mill canal
Image
Image
Image
Image
Image
Image
Image
Image
3,8
construction of city center relief route (until 2025)
350
Image
Image
4,0
Südtirolerplatz/Kunsthaus 4 6 7
350
Image
Image
Image
Image
Image
Image
Image
4,1
← Grieskai/→ Lendkai
Image
Image
Image
4,1
Mur
Erzherzog-Johann-bridge
351
Image
Image
Image
Image
Image
Image
4,1
← Marburger Kai/→ Franz-Josef-Kai
Image
Image
4,3
3 5 to Andritz
350
Image
4,4
Hauptplatz-Congress 3 4 5 6 7
350
Image
Herrengasse (pedestrian zone)
Image
Image
Image
Image
Image
Image
Image
4,9
← Johanneumring/→ Opernring
Image
Image
Image
Image
4,9
4 to Liebenau/Murpark, 5 to Puntigam
351
Image
Image
Image
Image
Image
4,9
Jakominiplatz 3 4 5 6 7 (23)
351
Image
Image
Image
Image
5,0
turnaround Radetzkyspitz/relief route
352
Image
Image
Image
Image
Image
5,0
3 to Krenngasse, 6 to St. Peter
352
Image
Image
Image
Image
5,0
turnaround Steirerhof
352
Image
Image
Image
5,3
Kaiser-Josef-Platz/Oper 7
355
Image
Image
Image
Image
Image
Image
5,3
← Kaiser-Josef-Pl./→ Franz-Graf-Allee
355
Image
Image
Image
Image
Image
Image
5,6
former Line 2 to Hauptbahnhof (closed 1971)
Image
Image
Image
5,6
Maiffredygasse 7
358
Image
Image
5,9
Lichtenfelsgasse/Kunstuniversität 7
360
Image
Image
6,2
Merangasse 7
364
Image
Image
Image
Image
Image
6,2
Merangasse
364
Image
Image
6,2
Merangasse 7
364
Image
Image
6,4
Reiterkaserne 7
367
Image
Image
Image
Image
6,4
7
Image
Image
6,6
Tegetthoffplatz
367
Image
Image
Image
Image
Image
Image
6,6
Elisabethstraße
Image
Image
6,6
Tegetthoffplatz
367
Image
Image
6,9
Lenaugasse
369
Image
Image
7,3
Kroisbach
Image
Image
Image
Image
Image
7,3
Turnaround Hilmteich
374
Image
Image
Image
Image
7,4
Hilmteich/Botanischer Garten
375
Image
Image
Image
Image
Image
Image
Image
7,4
Schubertgasse
375
Image
Image
7,8
Schönbrunngasse
379
Image
Image
Image
8,1
Mariatroster Bach
Image
Image
Image
Image
Image
8,2
Hilmteichstraße/Mariatroster Straße
384
Image
Image
8,2
Mariagrün
(former light rail route)
384
Image
Image
8,8
Kroisbach
389
Image
Image
Image
8,8
Reifentalgasse
389
Image
Image
8,8
Kroisbach
389
Image
Image
8,9
Mariatroster Bach
Image
Image
9,3
St. Johann
394
Image
Image
Image
9,3
Freihofanger
394
Image
Image
9,3
St. Johann
394
Image
Image
Mariatroster Bach 2x
Image
Image
9,8
Rettenbach
400
Image
Image
Image
9,8
Rettenbacher Straße
400
Image
Image
9,9
Mariatroster Bach
402
Image
Image
10,0
Wagnesweg
403
Image
Image
Image
10,0
Wagnesweg
403
Image
Image
10,2
Waldhof/Rettenbachklamm
405
Image
Image
Image
10,2
Hans-Mauracher-Straße
405
Image
Image
10,2
Waldhof/Rettenbachklamm
405
Image
Image
10,3
Rettenbach
Image
Image
10,6
Teichhof
412
Image
Image
Image
10,6
Teichhofweg
412
Image
Image
10,9
Tannhof
415
Image
Image
Image
10,9
Tannhofweg
415
Image
Image
Image
Image
Image
11,0
Turnaround Mariatrost
Image
Image
Image
Image
Image
Image
11,2
Mariatrost Park and Ride
417
Image
Image
Image
Image
Connection to museum
Image
Image
Image
Tramway Museum Graz
418
Image
Image
Image
Image
Mariatrost Basilica
Image
Altstadtbim: riding is free in this segment
single track/track entanglement between halts
Line 3/(23)
Andritz - (Jakominiplatz) - Krenngasse
Overview
Native nameLinie 3/(23)
Termini
  • Andritz
  • Krenngasse
Stations19/7
Color on maplight green/purple
History
Current route sinceJuly 11, 2020 (2020-07-11)
Technical
Line length6.5 km (4.0 mi)
Route map

km
Image
Image
Image
Image
Image
Andritzer Reichsstraße
Image
0,0
Andritz 5
Andritzer Hauptplatz
363
Image
0,4
Grazerstrasse 5
360
Image
Image
Image
0,8
67a Grabenstraße
358
Image
Image
Image
Image
Image
1,0
Körösistraße
358
Image
Image
Image
Image
1,0
Maut Andritz 5
358
Image
Image
Image
1,0
Theodor-Körner-Straße
358
Image
Image
Image
1,5
Robert-Stolz-Gasse 5
357
Image
Image
Image
Image
Image
Image
1,7
Grabengürtel
Image
Image
1,8
Carnerigasse 5
355
Image
Image
1,8
Carnerigasse
355
Image
Image
2,1
Seniorenzentrum 5
354
Image
Image
Image
2,4
Hasnerplatz/Pädagog. Hochsch./tim 5
352
Image
Image
Image
Image
2,7
Lange Gasse 5
351
Image
Image
Image
Image
2,7
Körösistraße
351
Image
Image
Image
Image
Image
Image
Image
Image
3,1
← Keplerstraße/→ Wickenburggasse
352
Image
Image
3,1
Keplerbrücke 5
352
Image
Image
3,4
Schloßbergbahn 5 Image Schloßbergbahn
353
Image
Image
Image
3,6
Schloßbergplatz/Murinsel 5 Schloßberglift
351
Image
Image
3,8
1 4 6 7
to Hauptbahnhof
350
Image
3,9
Hauptplatz-Congress 1 4 5 6 7
350
Image
Herrengasse (pedestrian zone)
Image
Image
Image
Image
Image
Image
4,7
← Johanneumring/→ Opernring
352
Image
Image
turnaround Radetzkyspitz (23)
Image
Image
Image
Image
4,7
4 to Murpark, 5 to Puntigam
352
Image
Image
Image
Image
Image
Image
0,0/4,8
Jakominiplatz 1 4 5 6 7 (23)
352
Image
Image
Image
Image
Image
Image
Image
Image
0,0/4,8
Opernring/Gleisdorfer Gasse
352
Image
Image
Image
Image
Image
0,0/4,8
1 to Mariatrost 7 to LKH MED UNI/Klinikum Nord
352
Image
Image
0,1/4,9
turnaround Steirerhof
352
Image
Image
Image
Image
Image
Image
0,4/5,2
Dietrichsteinplatz
352
Image
Image
Image
Image
Image
0,4/5,2
6 to St. Peter
354
Image
Image
0,4/5,2
Dietrichsteinplatz 6 (23)
354
Image
Image
Image
Image
Image
0,7/5,5
Mandellstraße
357
Image
Image
0,7/5,5
Mandellstraße (23)
357
Image
Image
0,9/5,7
Rechbauerstraße (23)
360
Image
Image
Image
1,2/6,0
Herz-Jesu-Kirche (23)
361
Image
Image
1,5/6,3
Schillerplatz (23)
365
Image
Image
Image
Image
Image
1,6/6,4
Merangasse
365
Image
Image
Image
Schillerplatz
Image
Image
Image
Image
Image
1,7/6,5
Krenngasse (23)
365
Image
Image
Image
Image
Image
Krenngasse
Image
Altstadtbim: riding is free in this segment
Double km-numbers starting at Jakominiplatz: Line (23)
Line 4
Reininghaus - Liebenau/MURPARK
Overview
Native nameLinie 4
Termini
  • Reininghaus
  • Liebenau/MURPARK
Stations24
Color on maplight brown
History
Current route sinceNovember 26, 2021 (2021-11-26)
Technical
Line length8.5 km (5.3 mi)
Route map

km
Image
Image
Image
Image
Image
Image
0,0
Reininghaus
358
Image
Image
Image
Image
0,1
Domenico dell'Allio Allee
Image
Image
Image
Image
Image
0,3
Wetzelsdorfer Straße
360
Image
Image
0,3
Jochen-Rindt-Platz
360
Image
Image
Image
Image
Image
0,3
Southwestern line (planned)
360
Image
Image
Image
0,8
Reininghauspark/tim
364
Image
Image
1,1
Reininghausstraße
365
Image
Image
Image
Image
Image
1,2
Reininghausstraße - Alte Poststraße crossroads
Image
Image
Image
Image
Image
1,3
360
Image
Image
Image
Image
Image
1,8
7 to Wetzelsdorf
365
Image
Image
1,8
Alte Poststraße 7
365
Image
Image
Image
1,9
Remise III (Alte Poststraße) depot
364
Image
Image
2,0
Eggenberger Straße
exit only
364
Image
Image
Image
Image
2,2
1 to Eggenberg/UKH, 6 to Smart City
364
Image
Image
2,3
Köflacher Gasse/PVA Image 1 6 7
364
Image
Image
Image
Image
Image
Image
Image
Image
2,3
← Köflacher Gasse/→ Waagner-Biro-Straße
364
Image
Image
Image
2,4
Sublevel section local transport hub Hauptbahnhof
361
Image
Image
Image
Image
Image
2,4
360
Image
Image
Image
Image
2,6
Hauptbahnhof 1 6 7 Image S 1-S 7
357
Image
Image
Image
Image
Image
Image
2,7
← Eggenberger Gürtel/→ Bahnhofgürtel
Image
Image
Image
Image
Image
2,7
sublevel section ramp
Image
Image
Image
Image
Image
2,7
Annenstraße
Image
Image
Image
3,0
Esperantoplatz/Arbeiterkammer 1 6 7
355
Image
Image
Image
Image
Image
Image
Image
3,0
← Idlhofgasse/→ Hans-Ressel-Gasse
Image
Image
3,3
Roseggerhaus 1 6 7
355
Image
Image
Image
Image
Image
Image
Image
Image
Image
3,3
← Elisabethinergasse/→ Volksgartenstraße (line planned)
Image
Image
Image
Image
Image
3,3
right side of river Mur mill canal
Image
Image
Image
Image
Image
Image
3,5
construction of relief route (complete 2025)
351
Image
Image
3,7
Südtirolerplatz/Kunsthaus 1 6 7
354
Image
Image
Image
Image
Image
Image
Image
3,8
← Grieskai/→ Lendkai
Image
Image
Image
3,8
Mur
Erzherzog-Johann-bridge
353
Image
Image
Image
Image
Image
Image
3,8
← Marburger Kai/→ Franz-Josef-Kai
Image
Image
4,0
3 5
to Andritz
357
Image
4,0
Hauptplatz-Congress 1 3 5 6 7
357
Image
Herrengasse (pedestrian zone)
Image
Image
Image
Image
Image
Image
Image
4,4
← Johanneumring/→ Opernring
Image
Image
Image
4,4
1 3 6 7
towards east
353
Image
Image
4,5
Jakominiplatz 1 3 5 6 7 (23)
354
Image
Image
Image
4,5
Turn Johanneumring/relief route and turn Steirerhof
354
Image
4,6
track switch Jakoministraße
355
Image
Image
Image
Image
Image
Image
4,9
Grazbachgasse
Image
Image
5,0
Finanzamt 5
351
Image
Image
5,2
Steyrergasse 5
350
Image
Image
Image
Image
Image
Image
5,2
Remise I and II (Steyrergasse) depot
350
Image
Image
5,2
Steyrergasse 5
349
Image
Image
5,4
Jakominigürtel/tim 5
349
Image
Image
Image
Image
Image
Image
5,4
5
to Puntigam
348
Image
Image
5,6
Stadthalle
347
Image
Image
Image
5,7
Fröhlichgasse/Messe
345
Image
Image
Image
Image
Image
Image
Image
Image
5,7
Fröhlichgasse
345
Image
Image
Image
6,0
Ostbahnhof Image S 3 S 31
346
Image
Image
Image
6,4
Jauerburggasse
345
Image
Image
Image
Image
6,8
Turnaround Station Liebenau
343
Image
Image
Image
Image
6,8
Stadion Liebenau/Bertha v. Suttner Platz
343
Image
Image
Image
Image
343
Image
Image
Image
Image
Image
Image
6,8
Ulrich-Lichtenstein-Gasse
344
Image
Image
Image
6,8
Stadion Liebenau/Bertha v. Suttner Platz
344
Image
Image
Image
Image
Image
Image
6,9
← Liebenauer Hauptstr./→ Münzgrabenstr.
Image
Image
Image
7,0
Liebenauer Tangente
Image
Image
Image
Image
7,2
Dr.-Lister-Gasse
349
Image
Image
7,6
Karl-Huber-Gasse
351
Image
Image
Image
Image
Image
Image
Image
7,6
Karl-Huber-Gasse
Image
Image
7,9
P+R MURPARK Image
345
Image
Image
Image
8,0
Image
Image
Image
8,5
Liebenau/MURPARKImage S 3 S 31
347
Image
Altstadtbim: riding is free in this segment
Line 5
Andritz - Puntigam
Overview
Native nameLinie 5
Termini
  • Andritz
  • Puntigam
Stations28
Color on mapbrown
History
Current route sinceDecember 1, 2006 (2006-12-01)
Technical
Line length9.8 km (6.1 mi)
Route map

km
Image
Image
Image
Image
Image
Andritzer Reichsstraße
Image
0,0
Andritz 3
Andritzer Hauptplatz
363
Image
0,4
Grazerstrasse 3
360
Image
Image
Image
0,8
67a Grabenstraße
358
Image
Image
Image
Image
Image
Image
1,0
Körösisraße
358
Image
Image
Image
Image
1,0
Maut Andritz 3
358
Image
Image
Image
1,0
Theodor-Körner-Straße
358
Image
Image
Image
1,5
Robert-Stolz-Gasse 3
357
Image
Image
Image
Image
Image
Image
1,7
Grabengürtel
Image
Image
1,8
Carnerigasse 3
355
Image
Image
1,8
Carnerigasse
355
Image
Image
2,1
Seniorenzentrum 3
354
Image
Image
Image
2,4
Hasnerplatz/Pädagog. Hochsch./tim 3
352
Image
Image
Image
Image
2,7
Lange Gasse 3
351
Image
Image
Image
Image
2,7
Körösistraße
351
Image
Image
Image
Image
Image
Image
Image
Image
3,1
← Keplerstraße/→ Wickenburggasse
352
Image
Image
3,1
Keplerbrücke 3
352
Image
Image
3,4
Schloßbergbahn 3 Image Schloßbergbahn
353
Image
Image
Image
3,6
Schloßbergplatz/Murinsel 3 Schloßberglift
351
Image
Image
3,8
1 4 6 7
to Hauptbahnhof
350
Image
3,9
Hauptplatz-Congress 1 3 4 6 7
350
Image
Herrengasse (pedestrian zone)
Image
Image
Image
Image
Image
4,7
← Johanneumring/re: Opernring
352
Image
Image
Image
4,7
1 3 6 7
towards east
353
Image
Image
4,8
Jakominiplatz 1 3 4 6 7 (23)
353
Image
Image
Image
4,8
Turn Radetzkyspitz/relief route and turn Steirerhof
Image
4,9
Track switch Jakoministraße
351
Image
Image
Image
Image
Image
Image
4,9
Grazbachgasse
Image
Image
5,2
Finanzamt 4
349
Image
Image
5,4
Steyrergasse 4
348
Image
Image
Image
Image
Image
Image
5,4
Remise I and II (Steyrergasse) depot
Image
Image
5,4
Steyrergasse 4
348
Image
Image
5,6
Jakominigürtel/tim 4
346
Image
Image
Image
Image
Image
Image
5,6
4
to Liebenau
Image
Image
Image
6,0
Josefkirche
346
Image
Image
Image
Image
Image
6,0
Schönaugasse
345
Image
Image
6,0
Josefkirche
345
Image
Image
6,2
Neuholdaugasse-Augartenbad
345
Image
Image
Image
Image
Image
6,2
Neuholdaugasse
345
Image
Image
Image
Image
Image
Image
Image
6,3
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
6,4
Karlauergürtel
346
Image
Image
Image
Image
Image
Image
6,5
connection to southwest line (planned)
Image
Image
Image
Image
Image
Image
6,6
Image
Image
7,0
Puchstraße
344
Image
Image
7,3
Dornschneidergasse
343
Image
Image
7,7
Lauzilgasse
344
Image
Image
Image
Image
Image
7,9
Turnaround Zentralfriedhof
Image
Image
Image
Image
Image
Image
7,9
67
Triester Straße
Image
Image
Image
Image
Image
Image
7,9
Zentralfriedhof (central cemetery) Image
346
Image
Image
Image
8,3
Plachelhofstraße
346
Image
Image
8,8
Maut Puntigam
348
Image
Image
9,3
Brauquartier/tim
348
Image
Image
Image
Image
Image
Image
9,3
Brauquartier
Image
Image
Image
9,5
Brauhaus Puntigam Image
347
Image
Image
Image
Image
9,5
67
Triester Straße
Image
Image
Image
Image
Image
9,7
Graz Puntigam Südbahn
Image
9,8
Puntigam Image Image S 5 S 6
341
Image
Altstadtbim: riding is free in this segment
Line 6/16
Smart City - St. Peter
Overview
Native nameLinie 6/16
Termini
  • Smart City/P.Tunner-Gasse/tim
  • St. Peter
Stations23
Color on mapgreen
History
Current route sinceNovember 26, 2021 (2021-11-26)
Technical
Line length8.2 km (5.1 mi)
Route map

km
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
0,0
Smart City/P.Tunner-Gasse/tim
366
Image
Image
Image
Image
Image
Image
Image
Image
0,3
Nikolaus-Harnoncourt-Park
367
Image
Image
Image
Image
0,5
Dreierschützengasse
Image
Image
0,5
Dreierschützengasse/H. List Halle
366
Image
Image
0,8
Starhemberggasse
365
Image
Image
Image
Image
0,8
Starhemberggasse
Image
Image
Image
Image
1,1
Waagner-Biro-Straße
Image
Image
Image
Image
1,2
Daungasse/Hauptbahnhof
364
Image
Image
Image
Image
Image
Image
1
to Eggenberg/UKH and turnaround Laudongasse
Image
Image
Image
Image
Image
Image
Image
1,5
4 to Reininghaus, 7 to Wetzelsdorf
364
Image
Image
Image
1,6
Köflacher Gasse/PVA Park and Ride 1 4 7
(Image S 61 S 7)
362
Image
Image
Image
Image
Image
Image
Image
Image
1,6
← Köflacher Gasse/→ Waagner-Biro-Straße
Image
Image
Image
Image
1,8
Sublevel section local transport hub Hauptbahnhof
Image
Image
Image
Image
Image
1,8
364
Image
Image
Image
Image
2,0
Hauptbahnhof 1 4 7 Image S 1-S 7
357
Image
Image
Image
Image
Image
Image
2,0
← Eggenberger Gürtel/→ Bahnhofgürtel
Image
Image
Image
Image
Image
2,2
sublevel section ramp
Image
Image
Image
Image
Image
2,2
Annenstraße
Image
Image
Image
2,4
Esperantoplatz/Arbeiterkammer 1 4 7
355
Image
Image
Image
Image
Image
Image
Image
2,4
← Idlhofgasse/→ Hans-Ressel-Gasse
Image
Image
2,7
Roseggerhaus 1 4 7
351
Image
Image
Image
Image
Image
Image
Image
Image
Image
2,7
← Elisabethinergasse/→ Volksgartenstraße (new line planned)
Image
Image
Image
Image
Image
2,7
right side of river Mur mill canal
Image
Image
Image
Image
Image
Image
2,9
construction of relief route 16/17 (until 2025)
350
Image
Image
Image
Belgiergasse 16 17
(under construction)
Image
Image
Image
3,0
Südtirolerplatz/Kunsthaus 1 4 6 7
350
Image
Image
Image
Image
Image
Image
Image
Image
Image
3,1
← Grieskai/→ Lendkai
Image
Image
Image
Image
3,1
Mur
351
Image
Image
Image
Image
Image
Image
Image
Image
Image
3,1
← Marburger Kai/→ Franz-Josef-Kai
Image
Image
Image
Image
3,3
3 5 to Andritz
350
Image
Image
Image
3,4
Hauptplatz-Congress 1 3 4 5 6 7
350
Image
Image
Image
Neutorgasse 16 17
(under construction)
Image
Image
Image
Herrengasse (pedestrian zone)
Image
Image
Image
Image
Image
Image
Image
Image
Image
3,9
← Joanneumring/→ Opernring
Image
Image
turnaround Radetzkyspitz (23)
Image
Image
Image
Image
3,9
4 to Liebenau/MURPARK, 5 to Puntigam
352
Image
Image
Image
Image
Image
Image
4,0
Jakominiplatz 1 3 4 5 6 7 (23)
352
Image
Image
Image
Image
Image
Image
Image
Image
4,0
Opernring/Gleisdorfer Gasse
352
Image
Image
Image
Image
Image
4,0
1 to Mariatrost 7 to LKH MED UNI/Klinikum Nord
352
Image
Image
4,1
turnaround Steirerhof
352
Image
Image
Image
Image
Image
Image
4,6
Dietrichsteinplatz
352
Image
Image
4,6
Dietrichsteinplatz 3
352
Image
Image
Image
Image
Image
4,6
3 (23) to Krenngasse
352
Image
Image
4,6
Dietrichsteinplatz 3
352
Image
Image
5,0
Neue Technik
351
Image
Image
Image
Image
Image
4,6
Steyrergasse
351
Image
Image
5,0
Neue Technik
351
Image
Image
5,2
Münzgrabenkirche
352
Image
Image
Image
Image
Image
5,5
Münzgrabenstraße
352
Image
Image
5,5
Moserhofgasse/Messe
353
Image
Image
6,0
St. Peter Friedhof
359
Image
Image
Image
Image
Image
6,0
Petersgasse
352
Image
Image
6,3
Schulzentrum St.Peter
361
Image
Image
Image
Wendeschleife Schulzentrum St. Peter 6
Image
Image
Image
6,4
Schulzentrum St.Peter 16
361
Image
Image
Image
Image
Image
Beginning 2025 6 turns here, 16 goes to St. Peter
Image
Image
Image
6,8
Plüddemanngasse 16
364
Image
Image
Image
Image
Image
Image
6,8
Plüddemanngasse
364
Image
Image
6,8
Plüddemanngasse 16
364
Image
Image
Image
Image
Image
7,0
Sankt-Peter-Pfarrweg
Image
7,1
Eisteichgasse 16
372
Image
Image
7,4
Breitenweg
370
Image
Image
7,4
Breitenweg 16
370
Image
Image
7,7
Prof.-Franz-Spath-Ring 16
365
Image
Image
7,7
Peterstalgasse
Image
Image
8,2
St. Peter 16
372
Image
Altstadtbim: riding is free in this segment
Line 7/17
Wetzelsdorf - LKH Med Uni/Klinikum Nord
Overview
Native nameLinie 7/17
Termini
  • Wetzelsdorf
  • LKH Med Uni/Klinikum Nord
Stations25
Color on maporange
History
Current route sinceSeptember 10, 2016 (2016-09-10)
Technical
Line length7.7 km (4.8 mi)
Route map

km
Image
Image
Image
Wetzelsdorfer Straße
Image
Image
0,0
Wetzelsdorf
Image
Image
Image
0,1
Burgenlandstraße
Image
Image
0,1
Wetzelsdorf
Burgenlandstraße
Image
Image
0,3
Handelstraße
Image
Image
Image
Image
0,3
Handelsstraße
Image
Image
0,5
Johann-Haiden-Straße
Image
Image
0,9
Baierdorf
Image
Image
1,2
Absengerstraße
Image
Image
1,6
Karl-Morre-Str./Gemeindeamt
Image
Image
Image
Image
1,6
Eckertstraße
Image
Image
1,9
Franz-Steiner-Gasse
Image
Image
2,2
Fachhochschule Joanneum
Image
Image
Image
Image
Image
Image
Image
2,4
4 to Reininghaus, Alte Poststraße
Image
Image
2,4
Alte Poststraße 4
Image
Image
Image
2,5
Remise III (Alte Poststraße) depot
364
Image
Image
2,6
Eggenberger Straße
exit only
364
Image
Image
Image
Image
Image
2,8
1 to Eggenberg/UKH, 6 to Smart City
364
Image
Image
2,9
Köflacher Gasse/PVA Image 1 4 6
364
Image
Image
Image
Image
Image
Image
Image
Image
2,9
← Köflacher Gasse/→ Waagner-Biro-Straße
364
Image
Image
Image
3,0
Sublevel section local transport hub Hauptbahnhof
361
Image
Image
Image
Image
Image
3,0
360
Image
Image
Image
Image
3,2
Hauptbahnhof 1 4 6 Image S 1-S 7
357
Image
Image
Image
Image
Image
Image
3,3
← Eggenberger Gürtel/→ Bahnhofgürtel
Image
Image
Image
Image
Image
3,3
sublevel section ramp
Image
Image
Image
Image
Image
3,3
Annenstraße
Image
Image
Image
3,6
Esperantoplatz/Arbeiterkammer 1 4 6
355
Image
Image
Image
Image
Image
Image
Image
3,6
← Idlhofgasse/→ Hans-Ressel-Gasse
Image
Image
3,9
Roseggerhaus 1 4 6
355
Image
Image
Image
Image
Image
Image
Image
Image
Image
3,9
← Elisabethinergasse/→ Volksgartenstraße (line planned)
Image
Image
Image
Image
Image
3,9
right side of river Mur mill canal
Image
Image
Image
Image
Image
Image
Image
Image
4,1
construction of relief route 16/17 (complete 2025)
351
Image
Image
Image
Belgiergasse 16 17
(under construction)
Image
Image
Image
4,3
Südtirolerplatz/Kunsthaus 1 4 6
354
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
4,4
← Grieskai/→ Lendkai
Image
Image
Image
Image
Image
4,4
Mur
351
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
4,4
← Marburger Kai/→ Franz-Josef-Kai
Image
Image
Image
Image
4,6
3 5
to Andritz
357
Image
Image
Image
4,6
Hauptplatz-Congress 1 3 4 5 6
357
Image
Image
Image
Neutorgasse 16 17
(under construction)
Image
Image
Image
Herrengasse (pedestrian zone)
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
Image
5,0
← Johanneumring/→ Opernring
Image
Image
turnaround Radetzkyspitz (23)
Image
Image
Image
Image
Image
5,0
4 to Liebenau/Murpark, 5 to Puntigam
351
Image
Image
Image
Image
Image
5,0
Jakominiplatz 1 3 4 5 6 (23)
351
Image
Image
Image
Image
5,1
turnaround Radetzkyspitz/relief route
352
Image
Image
Image
Image
Image
5,1
3 to Krenngasse, 6 to St. Peter
352
Image
Image
Image
Image
5,1
turnaround Steirerhof
352
Image
Image
Image
5,4
Kaiser-Josef-Platz/Oper 1
355
Image
Image
Image
Image
Image
Image
5,4
← Kaiser-Josef-Pl./→ Franz-Graf-Allee
355
Image
Image
Image
Image
Image
Image
5,7
former Line 2 to Hauptbahnhof (closed 1971)
Image
Image
Image
5,7
Maiffredygasse 1
358
Image
Image
6,0
Lichtenfelsgasse/Kunstuniversität 1
360
Image
Image
6,3
Merangasse 1
364
Image
Image
Image
Image
Image
6,3
Merangasse
364
Image
Image
6,3
Merangasse 1
364
Image
Image
6,5
Reiterkaserne 1
367
Image
Image
Image
Image
Image
6,5
1
Image
Image
Image
7,0
Odilien-Institut/Klinikum Süd
state hospital
373
Image
Image
Image
Image
Image
7,3
Image
Image
7,4
St. Leonhard/Klinikum Mitte
376
Image
Image
Image
Image
Image
Image
Image
Image
Image
7,7
LKH Med Uni/Klinikum Nord
379
Image
Image
Image
Altstadtbim: Service is free in this segment

Route network

[edit]

The following services operate during the day on Mondays to Saturdays:[1][9]

The following services operate in the evenings and on Sundays:[1][9]

  • Lines 1, 4, 5, 6 and 7: as above
  • Line 23: Krenngasse – Jakominiplatz

Infrastructure

[edit]

Graz's tram network is built to standard gauge and is electrified using overhead line at 600 V DC. The network is largely double track, with some 3.5 kilometres (2.2 mi) of single track on the northern, former light railway, section of line 1, and just over 1 kilometre (0.62 mi) towards the southern terminus of line 5 (construction work to expand line 5 to double tracks will finish in November 2024). Most of the track is at grade, with the exception of the subsurface tram stop, with linking tunnels, at the main railway station, and a short tunnel just before the southern terminus of line 5.[3][9][10]

With the exception of the short tunnelled sections, and the former light railway section of line 1, all of the system is street based, with varying degrees of segregation. As the trams are single-ended, with doors on only one side, all terminal locations are equipped with turning loops, and all tram stops are to the nearside of the tram.[3][10]

Tram fleet

[edit]

As of 2026, the Graz tramway network's fleet was:[11][12]

Nos. Image Manufacturer Built Length(mm) Axles Wheelbase(mm) Seated/Standing Notes
501–510 (10) Image SGP Graz 1978 25,343 8 6,000 40/94
601–612 (12) Image SGP Graz 1986–1987 27,000 8 6,000 41/126 Low-floor middle segment installed 1999.
651–668 (18) Image Bombardier Transportation 2000–2001 27,000 6 6,000 54/90 To Bombardier's standard, 100% low-floor, Cityrunner design.
201–245 (45) Image Stadler Rail 2009–2015 27,000 6 6,000 54/90 To Stadler Rail's standard, 100% low-floor, Variobahn design.
(31) Image Alstom 2025– 33.810 6 140/60 Alstom Flexity, service starting 2026, 100% low-floor[13][7][14]
Image
Tram on the former light railway section of line 1

Tickets and fares

[edit]

The Graz tramway network is entirely within zone 101 of the Verbund Linie, an integrated tariff for public transport throughout Styria. Zone 101 tickets are valid on all trams, and all city buses with single or double digit route numbers. They are also valid on regional buses, which have three digit route numbers, and trains, but only within the boundary of the zone.[15]

Tickets are available for different periods of validity, including one hour, 24 hours, a week, a month or a year, and allow unlimited changes of vehicle within the validity period. Tickets can be purchased from ticket machines on board the trams or at the major stops, from tobacconists, or from a central office. They are also available by SMS text message or via a smartphone app.[15]

Aimed at visitors to the city, there is also a three-day ticket which allows unlimited travel within the city for three days, as well as giving reduced admission charges at selected attractions. The ticket is available at hotels and other accommodation, at the city tourist information office, at ticket sale counters at the Schloßbergbahn funicular, and at Graz Airport.[16]

Future

[edit]
Image
Variobahn on the route through Neutorgasse, opened in 2025

With the introduction of the full set of Variobahn trams, many of Graz's older high-floor trams will be retired. It is also planned to lengthen the new Variobahn trams by adding 2 further sections to the trams.[3]

There are plans for a number of extensions to existing lines plus the building of 1 new line.

On February 5, 2018, the co-financing of a comprehensive expansion program was signed between the city of Graz and, for the first time, the province of Styria. By 2023, 117 million euros are to be allocated for the construction or expansion of six routes. Co-financing from the federal government is being sought.

  • Downtown relief route via Belgiergasse, Vorbeckgasse to Annenstraße (approximately 1 km, 27 million euros, 2022–2025).
  • Double-track expansion of Line 5 from the Central Cemetery to Brauquartier Puntigam (15.3 million euros, October 2022 – November 2024).[17]
  • Double-track expansion of Line 1 from Hilmteich to Mariagrün (6.3 million euros, by 2023).
  • Partial double-track expansion of Line 1 between Mariagrün and Mariatrost (in several construction phases, 2.3 million euros, by 2023).

Line 8 is in a planned 12.6 km connection between Gösting and Straßgang, of which 11 km will be new track. The line would be built in multiple stages. A north-west section (NW1) will be built between Roseggerhaus and Fröbelpark. A south-west section (SW2) will be built between Karlauer Gürtel and Reininghaus via Citypark and Don Bosco with some portions of the line in mixed traffic. Planning is to continue until 2028, construction would start in 2030 and the new line would go into service in 2033. In 2025, construction costs were estimated at €72 million for NW1 and €93.5 million for SW2.[18][7]

  • Line 8: Jakominiplatz – Citypark – Don Bosco – Reininghaus – Straßgang
Image
Flexity test run in Graz (2019)

See also

[edit]

References

[edit]
  1. 1 2 3 "Liniennetzplan Graz" [Public Transport Network of Graz] (PDF). holding-graz.at (in German). Holding Graz. September 2013. Retrieved 5 October 2013.
  2. 1 2 3 4 "Dienstleister für Generationen - Geschäftsbericht der Holding Graz 2012" [Supplier for Generations - Business Report of Holding Graz 2012] (PDF). holding-graz.at (in German). Holding Graz. August 2013. p. 47. Retrieved 5 October 2013.
  3. 1 2 3 4 5 6 7 8 9 10 11 Pulling, Neil (August 2013). "System Factfile 71: Graz, Austria". Tramways & Urban Transit. Ian Allan Ltd / Light Rail Transit Association. pp. 340–343.
  4. ↑ Wegenstein, Peter (1994). Bahn im Bild 94 - Die Straßenbahn von Graz (in German). Vienna: Verlag Pospischil. p. 6.
  5. ↑ "Probleme mit Variobahn offiziell für beendet erklärt" [Problems with Variobahn officially declared finished]. Kleine Zeitung (in German). 12 April 2013. Retrieved 31 July 2013.
  6. ↑ "Verlängerung der Linie 7" [Extension of line 7] (in German). Holding Graz. Retrieved 30 July 2003.
  7. 1 2 3 "New trams, a new route and more plans in Graz". Urban Transport Magazine. 10 December 2025. Archived from the original on 26 December 2025.
  8. ↑ Graz opens its second citycentre tram line Tramways & Urban Transit issue 1058 February 2026 page 45
  9. 1 2 3 Schwandl, Robert (2010). Schwandl's Tram Atlas Schweiz & Österreich. Berlin: Robert Schwandl Verlag. ISBN 978 3 936573 27 5. (in German and English)
  10. 1 2 "Graz - Straßenbahnnetzplan" [Graz - Tram track plan] (PDF). doprava.unas.cz (in German). January 2011. Retrieved 30 July 2013.
  11. ↑ Kaiser, Wolfgang (2004). Straßenbahnen in Österreich. München: GeraMond. pp. 126–127. ISBN 3765471984.
  12. ↑ Holding Graz Linien – Sekretariat Technische Services Straßenbahn.
  13. ↑ "15 neue Straßenbahnen für Graz". ORF Steiermark (in German). 1 February 2024. Retrieved 1 March 2024.
  14. ↑ "Graz: First new Flexity Tram starts passenger service". Urban Transport Magazine. 4 June 2026.
  15. 1 2 "Tickets & Tarife" [Tickets & Fares] (in German). Holding Graz. Retrieved 29 July 2003.
  16. ↑ "Graz 3-Days Ticket". Verbund Linie. Retrieved 29 July 2003.
  17. ↑ "Triesterstraße Linie 5 Zweigleisiger Ausbau - Seite 2". www.styria-mobile.at. Retrieved 1 November 2023.
  18. ↑ red, steiermark ORF at/Agenturen (17 May 2023). "Graz will 68 Millionen in 15 neue Trams investieren". steiermark.ORF.at (in German). Retrieved 1 November 2023.
[edit]
  • Wikimedia Commons logo Media related to Tram transport in Graz at Wikimedia Commons
  • Holding Graz Linien web site (in German)
  • Track plan of the Graz tram system
  • gallery of Graz trams