Line 10 (Chongqing Rail Transit)

From Wikipedia, the free encyclopedia

Line 10
Image
A train of Line 10 at Changhe station
Overview
Native name重庆轨道交通10号线
StatusOperational
Line number10
LocaleChongqing, China
Termini
Stations27
Service
TypeRapid transit
SystemChongqing Rail Transit
Operator(s)Chongqing Rail Transit (Group) Co., Ltd.
History
Opened28 December 2017; 8 years ago (2017-12-28)
Technical
Line length43.26 km (26.88 miles) (operational)
Number of tracks2
Track gauge1,435 mm (4 ft 8+1⁄2 in)
Electrification1500 V DC overhead line
Operating speed100 km/h (62 mph) (Peak)
Route map

Image
Lanhualu
Image
Image
Lanhualu depot
Image
Image
Image
Image
Image
Image
Image
Image
Image
Nanhu
Image
Image
Image
Image
Image
Image
Image
Wanshoulu
Image
Nanping
Image
Image
Houbao
Image
Image
Image
Image
Qixinggang
Image
Chongqing People's Auditorium
Image
Zengjiayan
Image
Image
Image
Image
Image
Image
Image
Liyuchi
Image
Image
Image
Image
Image
Image
Image
Image
Image
Hongtudi
Image
Image
Image
Longtousi Park
Image
Image
Image
Image
Image
Chongqing N. Station
South Square
Image
Image
Image
Image
Image
Image
Image
Image
Image
Chongqing N. Station
North Square
4
Bus interchange Chongqing North railway station
Image
Image
Image
Image
Image
Minxinjiayuan
Image
Image
Image
Sanyawan
Image
Image
Image
Image
Image
Image
Shangwanlu
Image
Image
Image
Image
Image
Image
Image
Image
Huanshan Park
Image
Changhe
Image
Image
Image
Image
Zhujiawan depot
Image
Image
Image
Image
Jiangbei Airport
Terminal 3
Jiangbei Airport
Image
Jiangbei Airport
Terminal 2
Jiangbei Airport Bus interchange
Image
Yubei Square
Image
Image
Image
Lushan
Image
Image
Image
Image
Image
Central Park East
Image
Image
Image
Central Park
Image
Central Park West
Image
Image
Line 6 Int'l Expo branch to Lijia
Image
Image
Yuelai
Image
Image
Image
Wangjiazhuang depot
Image
Image
Wangjiazhuang
Image
Line 6 Int'l Expo branch to Shaheba

Line 10 of Chongqing Rail Transit is a rapid transit line that opened on 28 December 2017.[1] Rapid trains started operating on Line 10 in June 2020.[2]

The trains on Line 10, which links Jiangbei Airport and Chongqing North railway station, are equipped with a luggage rack on each car.[3]

Interior of a Line 10 train
Interior of a Line 10 train
Luggage rack
Luggage rack

Opening timeline

[edit]
SegmentCommencementLengthStation(s)Name
Wangjiazhuang – Liyuchi 28 December 2017 33.7 km (20.94 mi) 18 Phase 1
Chongqing North Station South Square 28 December 2018 infill station 1
Liyuchi – Houbao[4] 18 January 2023 6 km (3.7 mi)[4] 4 Phase 2 (initial section)
Houbao – Lanhualu 30 November 2023[5] 4.75 km (2.95 mi) 4 Phase 2 (remain section)

Stations (north to south)

[edit]
Map
Route of Line 10
Service
routes
Station
№
Station name Connections Distance
km
Location
R L English[6] Chinese
● ●
1Image
/
27
Wangjiazhuang 王家庄      Line 6 - 0 Liangjiang
| ●
1Image
/
26
Yuelai 悦来      Line 6 2.04 2.04
● ●
1Image
/
25
Central Park West 中央公园西      Line 5 2.71 4.75
| ●
1Image
/
24
Central Park 中央公园 1.09 5.84
| ●
1Image
/
23
Central Park East 中央公园东      Line 9 0.82 6.66
| ●
1Image
/
22
Lushan 鹿山 1.64 8.30
| ●
1Image
/
21
Yubei Square 渝北广场 2.05 10.35
● ●
1Image
/
2Image
Terminal 2 of Jiangbei Airport 江北机场T2航站楼      Line 3 Chongqing Jiangbei International Airport CKG 0.74 11.09
● ●
1Image
/
19
Terminal 3 of Jiangbei Airport 江北机场T3航站楼  15  Chongqing Jiangbei International Airport CKG 2.22 13.31
| ●
1Image
/
18
Changhe 长河 5.31 18.62
| ●
1Image
/
17
Huanshan Park 环山公园 1.85 20.47
● ●
1Image
/
16
Shangwanlu 上湾路      Line 9 1.67 22.14
| ●
1Image
/
15
Sanyawan 三亚湾 2.74 24.88
| ●
1Image
/
14
Minxinjiayuan 民心佳园 2.08 26.96
● ●
1Image
/
13
Chongqing North Station North Square[a] 重庆北站北广场      Line 4
 YW  Chongqing North railway station CUW
2.61 29.57
● ●
1Image
/
12
Chongqing North Station South Square[a] 重庆北站南广场      Line 3      Loop line
 YW  Chongqing North railway station CUW
0.60 30.17
| ●
1Image
/
11
Longtousi Park 龙头寺公园 0.87 31.04
● ●
1Image
/
1Image
Hongtudi 红土地      Line 6 1.63 32.67
● ●
1Image
/
Image9
Liyuchi 鲤鱼池      Line 9 1.09 33.76
● ●
1Image
/
Image8
Zengjiayan 曾家岩      Line 2 0.82 34.58 Yuzhong
| ●
1Image
/
Image7
Chongqing People's Auditorium 大礼堂 0.92 35.5
● ●
1Image
/
Image6
Qixinggang 七星岗      Line 1  18  0.89 36.39
| ●
1Image
/
Image5
Houbao[4] 后堡 2.12 38.51 Nan'an
| |
1Image
/
Image4
Nanping 南坪      Line 3  27  1.22 39.73
● ●
1Image
/
Image3
Wanshoulu 万寿路 0.98 40.71
| ●
1Image
/
Image2
Nanhu 南湖      Loop line 1.27 41.98
● ●
1Image
/
Image1
Lanhualu 兰花路 1.28 43.26

Notes

[edit]
  1. 1 2 The former translation is North/South Square of Chongqingbei Railway Station, which has been replaced since the opening of Line 10's station

References

[edit]
  1. ↑ "重庆市主城形成多层次立体交通体系". May 16, 2017.
  2. ↑ "轨道交通将跨线运行 唐家沱到重图不到40分钟-新华网". m.xinhuanet.com. Retrieved August 27, 2020.
  3. ↑ Jiang, Yan; Hu, Jie (December 18, 2017). 轨道也将有"超车道"! 五号线十号线将分"快慢车"-上游新闻 汇聚向上的力量. Chongqing Morning Paper (in Chinese (China)). Retrieved February 24, 2018.
  4. 1 2 3 "重庆轨道交通10号线二期通过竣工验收". January 9, 2023. 重庆轨道交通10号线二期(鲤鱼池至后堡)呈南北走向,线路全长6公里
  5. ↑ "重庆轨道5号线、10号线剩余路段30日开通初期运营". www.cqcb.com. November 29, 2023. Retrieved November 29, 2023.
  6. ↑ "重庆轨道交通线网图". Archived from the original on June 9, 2022.